P 4
Please retain product label and instructions for future reference
Step3
Cut down the underhang framing
(X)
by 70mm on both ends. It may be
necessary to re-attach the framing
and attach the rest of the side shed
following the same steps.
Fix the side of the Door Panel
(No.1)
against the side of the 8x8
Corner Summerhouse Window
Panel as shown using
4x60mm screws.
Do not secure the building
to the Floor until the roof is fitted.
4x60mm Screws
**To position the side shed on the
right, you do not need to alter the
under hang framing.
1
X
Pre drill
hole
60mm
screw
Step 4
Fix the side of the Back Panel
(No.2)
against the side of the 7x7 Corner
Summerhouse Back Panel as
shown using 4x60mm screws.
Do not secure the building
to the Floor until the roof
is fitted.
4x60mm Screws
Pre drill
hole
60mm
screw
2
Step 5
Fix the side of the Door Panel
(No.1)
and the Back Panel
(No.2)
against the
back of the Side Panel
(No.3)
using
6x50mm screws as shown.
*8x8 Corner Summerhouse
not shown*
Do not secure the building to the
Floor until the roof is fitted.
6x50mm Screws
Pre drill
hole
50mm
screw
2
1
3
Step 6
Place the Double Boarded Gable
Top
(No.7)
on top of the Side
Panel
(No.3)
slotting the boarding
of the Gable over the top of the
boarding of the side panel as
shown .
Fix with 4x50mm screws
per gable top as
shown inthe diagram.
4x50mm Screws
Pre drill
hole
50mm
screw
7
3
7
3
Internal Edge
External Edge
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk