background image

P 10

Please retain product label and instructions for future reference

             

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

AFTER TREATMENT:

score around protective

 cover on glazing and

 carefuly peel

 covering back

Step 21

Attach the remaining rain 

guard 

(No. 14) 

above the 

doors, fixing in place using 

3x60mm

3x60mm Screws

60mm 

screw

14

14

Pre drill 

hole

Step 22

On the inside of the building fix 

the Door Frame Strips  

(No. 26 

& 27)

, to the top and sides of 

the  doors frames.  Make sure 

that the edges are flush with 

the edge of the framing. Fix 

with 4x30mm screws per strip. 

 

12x30mm Screws

Pre drill 

hole

30mm 

screw

27

26

26

27

26

Summary of Contents for 03TGCOR0909DDFW-V1

Page 1: ...extended periods of warm sunshine and sheltered as much as possible during rain or snow Once your garden building has been installed it will need to be treated as soon as possible and annually to prev...

Page 2: ...03TGCORPGR1417X2017 V1 Large Gable Left QTY 1 AI 03TGCORPGL1389X2094 V1 Small Gable Left QTY 1 AI 03TGCORPGL1417X2017 V1 Large Roof QTY 1 AI 03TAGROOF1685X2889 V1 Small Roof QTY 1 AI 03TAGROOF1204X288...

Page 3: ...PI 07 0114 Press Lock QTY 1 PI 07 0162 Rounded Butt Hinge QTY 6 PI 07 0066 L Bracket QTY 2 PI 07 0012 Chrome Handle QTY 2 PI 07 0081 Turn Button QTY 2 PI 07 0034 34 35 Locating Block 28x28x239mm QTY 2...

Page 4: ...the doors using 25mm screws Ensuring the doors are positioned equally fix the hinges to the door panel using 30mm screws 18x25mm Screws 18x30mm Screws Pre drill hole 2 11 12 31 30mm screw 25mm screw...

Page 5: ...corners together with 3x 60mm screw a shown in diagram Do not fix the panels to the floor untill the roof has been fitted 3x60mm Screws c Pre drill hole 60mm screw 5 17 Pre drill hole Step 7 Place the...

Page 6: ...e framing sits flush with the gable framing and fix in place with 4x50mm screws Place the front right window framing No 19 on top of the window panel opposite the left gables ensure the framing sits f...

Page 7: ...n the illustration using 6x30mm screws Ensure to fix the framing the opposite direction to the roof bearers Fix the locating blocks No 35 to the opposing sides to the roof framing these blocks are to...

Page 8: ...e fascia width as guide for overhang Fix each sheet using felt tacks along where sheet overlap Use felt tacks at 100mm intervals 200x10mm felt tacks Step 15 HANDLE WITH CARE 1 2 3 4 100cm 20cm 20cm 20...

Page 9: ...s No 22 to the window sides of the building using 3x40mm screws per fascia Fit the fascia No 21 to the front of the building using 3x40mm screws 19x40mm Screws Step 18 22 40mm screw Pre drill hole 22...

Page 10: ...refuly peel covering back Step 21 Attach the remaining rain guard No 14 above the doors fixing in place using 3x60mm 3x60mm Screws 60mm screw 14 14 Pre drill hole Step 22 On the inside of the building...

Page 11: ...2 1 3 4...

Page 12: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...

Reviews: