background image

50mm 

screw

Pre drill 

hole

16x50mm screws

Remove transportation blocks 
from the bottom of each panel 
before beginning assembly. 
Each Panel should have two 
blocks.

Place 

floor

 on a firm and level 

base, ensure base has suitable 
drainage  free from areas 
where standing water can 
collect.  (See front page on 
base requirements). 

30mm 

screw

Pre drill 

hole

36x30mm screws

11

11

30mm 

screw

Pre drill 

hole

8x30mm screws

b

Position floor section a & b as in 
diagram so that floors are flush to 
each other, note that the floors do 
not connect by a T&G joint. 
Fix with 16x50mm screws alternate 
the fixing positions along the 
length of the floors.

Step 1 Floor Assembly

Pre Assembly

b

Join the flush hinges to the door 
frames using 30mm screws. Ensure 
hinges are attached using the 
outer plate of the hinge.

Fit the doors to the door panel with 
30mm screws making sure to use 
the inner plate of the hinge.

Step 2 Door Fixings

1

31

13

The Mortice Lock is Reversible

Fit the mortice lock 
into the recess and 
fix in place with the 
screws provided. Fit 
the key plate to the 
opposite door using 
the screws provided.

30

33

Fix the door handles and the metal bar (spindle) using 8x30mm 
screws. Ensure the mortice lock closes correctly.  If not,  remove 
lock and turn the catch around using the small grub screw.

29

Reviews: