1
2
3
4
5
6
10
11
L-Bracket
Qty 6
28
We strongly recommend pre drilling
holes before fixing screws.
50mm Screw x34
40mm Screw x100
Felt Tacks x165
30mm Screw x125
60mm Screw x50
30mm Black Screw x2
7
8
9
27
x4 Rain Guard 580mm
03HEL0808DDFW-V1
For domestic and family use only
Retain Instructions for future reference
Dimensions
Length = 2416mm
Width = 2436mm
Height = 2124mm
For Assistance Please
Contact Customer Care on
01636 880514
2mm Drill bit
x2
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
This building should be erected by
two people.
For ease of assembly, you must pilot
drill all screw holes and ensure all
screw heads are countersunk.
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand
(
not supplied)
including
a Phillips screwdriver, Stanley knife, wood saw,
step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be affected during various weather
conditions. For the duration of heavy or extended periods of rain, swelling of the
wood panels may occur. Warping of the wood may also occur during excessive
dry spells due to an interior moisture loss. Unfortunately, these processes cannot
be avoided but can be helped. It is suggested that the outdoor building is
sprayed with water during extended periods of warm sunshine and sheltered as
much as possible during rain or snow.
Our buildings are delivered pre-treated with a water based timber treatment
however this only helps to protect during transit of your garden item.
To
validate your guarantee and for better protection against weathering
it is
ESSENTIAL
that you treat the garden building with a wood preserver within 3
months of assembly. This will need to be re-applied annually to ensure longevity
of your building. Care must be taken when constructing the garden building
that it is not touching the ground and is on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and
annual treatment.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Ensure the base is level and is built on firm ground, to prevent distortion. Refer to diagrams for the base dimensions, The base should be slightly
smaller than the external measurement of the building, i.e. The cladding should overlap the base, creating a run off for water. It is also recommended
that the floor be at least 25mm above the surrounding ground level to avoid flooding.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level, we
cannot accept responsibility for your safety whilst erecting or using this product.
Before
assembly make sure you
have a suitable base
ready to erect your
building
**Protim Aquatan T5 (621)**
Your building has been treated with
Aquatan
.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct application of Aquatan solution and then allowed to dry.Aquatan is a
decorative finish to colour the wood, which is applied industrially to timber fence panels and garden buildings.
Aquatan
undiluted
contains:
boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
2x Front Fascia 1400mm
Fixing Kit
Door panel
Window
Gable R
Window
Gable L
Plain Side
Back Roof
Left
Back Roof
Right
Back
Floor
QTY 2
Slave
Door
Master
Door
4x Bottom Roof Trim 1455mm
12
4x Top Roof Trim 1510mm
13
2x Cover Trim 1783mm
14
2x Cover Trim 2059mm
15
Roof Support 2304mm QTY 3
16
2x Roof End 2960mm
17
Door Bar 1705mm
18
2x Door Beading 1711mm
19
Finial
23
Turn Button
QTY 2
22
Flush Hinge
QTY 6
Key Plate
21
20
Door Handle
QTY 2
24
Mortice Lock
25
Barrel Bolt
QTY 2
26
Felt
Nail Bag