P 7
Please retain product label and instructions for future reference
Felt
tacks
Cut the felt
(No.18)
into 3 strips
and place onto the roof, as shown
in the illustration. ensuring there
is approximatly 50mm of
overhanging around the building
Fix the sheets into place using 75x
felt tacks approximately 100mm
apart.
75x Felt Tacks
Step 12
Parts needed - No 18 QTY 1
HANDLE
WITH CARE
1
2
3
4
3
2
1
18
Fix the fascias
(No.10)
to the
building using 3x40mm screws
per fascia, ensuring the screws go
through to the roof framing
Fix the Shed Diamonds
(No.17)
onto the fascias using 2x40mm
screws per finial
16x40mm Screws
Pre drill
hole
40mm
screw
Step 13
Parts needed - No 10 QTY 4
- No 17 QTY 2
17
IMPORTANT:
Pre-drill before fixing screws.
10
10
17
10
10
Attach the door handles
(No.19)
to the
doors using 25mm bolts included with
the door handle.
Pre drill a hole approximately 3mm and
fix the handle from the inside with the
provided bolts
Attach the two turn buttons
(No.24)
above the master door at the top and
bottom using 2x30mm screws.
*These turn buttons help to keep your
doors straight during high & low levels
of moisture content in the air.
2x30mm Screws
4x35mm Bolt
Pre drill
hole
35mm
bolt
Step 14
Parts needed - No 19 QTY 2
- No 24 QTY 2
19
19
24
24
30mm
screws
24
19
IMPORTANT:
Pre-drill before fixing screws.
Summary of Contents for 03DTSHAX0705HGD2MW-V1
Page 14: ...P 9 1 2...
Page 15: ...P 9 2 1 3 4...