Please retain product label and instructions for future reference
P 10
Use 40mm screws to fix the roof
(No. 3
& No. 28)
down the sides, front and
back of the building.
Be sure that the screws attach into the
framing below.
20x40mm Screws
Pre drill
hole
40mm
screw
Step 10a
IMPORTANT:
Pre-drill before fixing screws.
3
28
b
b
b
b
b
b
b
b
b
b
b
b
b
b
Step 11a
IMPORTANT:
Pre-drill before fixing screws.
Pre drill
hole
50mm
screw
Secure the building to the
floor internally using
28x50mm screws.
*Ensure to screw through the
framing into the floor bearers.
28x50mm Screws
b
b
b
IMPORTANT:
Pre-drill before fixing screws.
*
Cut down
trims to fit
Pre drill
hole
30mm
screw
Step 12a
Parts needed - No 9 QTY 4
- No 13 QTY 2
- No 14 QTY 2
Attach the cover trims
(No.9)
to
each corner of the building using
3x30mm screws per cover trim.
Attach the gable cover trims
(No.13 and No.14)
onto the door
gable.
Cut the gable cover trims
(No.13)
and the cover trims
(No.9)
to fit as
shown in the illustration
8x30mm Screws
13
14
9
14
13
9
9
13
IMPORTANT:
Pre-drill before fixing screws.
Step 13a
Parts needed - No 27 QTY 1
Place the Veranda Floor
(No.27)
on the
ground, flush to the door gable as
shown in the illustration.
Ensure the veranda floor sits
centrally to the building.
27
Summary of Contents for 03DTSHAX0705HGD2MW-V1
Page 14: ...P 9 1 2...
Page 15: ...P 9 2 1 3 4...