background image

Please retain product label and instructions for future reference

             

P 12

Step 25

Parts needed - No. 34 previously 

cut in to pieces in step 11.

            Position the four largest pieces 

of felt that you have cut (if you have 

not yet cut your felt please refer to 

Step 11) at the bottom of each side 

of the roof and fix with evenly 

spaced felt tacks. 

Make sure the felt 

overhangs by 50mm. Trim as 

required.

 

Take the 1300mm long strip 

of felt cut in Step 11 and place it at 

the top of the roof and fix using felt 

tacks. 

Make sure the felt overlaps by 

50mm. 

           Using the four strips of felt cut 

in Step 11 place them over each of 

the ridges in the roof and fix using 

felt tacks, avoid felt tack already on 

the roof.

Secure all of the felt  using felt tacks 

with even spaces of 100mm 

between each tack.

270x Felt tacks

C

B

A

A

B

C

34

1

2

3

4

Step 26

Parts needed - No. 18 QTY 4

 

 

   No. 19 QTY 2

Secure the Fascias 

(No. 18 & 19)

 

to the building using 3 screws 

per piece. 

The Fascias for the side of the 

building should be secured last 

and will need to be cut to 

length.

*Ensure to screw through the 

fascia into the eaves frame 

behind avoiding any other 

screws.

18x30mm Screws

Pre drill 

hole

30mm 

screw

19

19

18

18

18

18

*

trim to fit

Step 27

Parts needed - No. 17 QTY 1

 

 

   No. 33 QTY 2

Before fitting the roof cap and the 

Finials to the Summer House, 

secure from underneath the two 

Finials 

(No. 33)

 to either each end 

of the Roof Cap  

(No. 17) 

by using 

one 50mm screw per Finial.

2x50mm Screws

17

33

33

Pre drill 

hole

50mm 

screw

Summary of Contents for 03DTMBHP0806RFP-V1

Page 1: ...moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered a...

Page 2: ...1970mm QTY 8 S1240 1970mm Roof Bearer A 44x58x985mm QTY 1 F4458 G 1025mm 2x32 CUTS 26 Unequal Hinge QTY 4 PI 07 0184 Window QTY 2 AI FW540X1132 V1 8 19 Eaves Frame 28x28x1784mm QTY 2 FS2828 1784mm 27...

Page 3: ...m screws 5 x 30mm Screws Pre drill hole 30mm screw 20 20 24 24 SIDE VIEW Step 2 Parts needed No 4 QTY 2 No 11 QTY 1 No 20 QTY 1 No 24 QTY 1 Lay all of the required parts on to a flat level surface and...

Page 4: ...6 to the door with 3x30mm screws per hinge Repeat the process for the Master Door No 9 36 x 30mm Screws 36 36 Pre drill hole 30mm screw 9 10 secondary Door Master Door 4 4 1 1 1 1 Step 4 Parts needed...

Page 5: ...nel No 5 to the second Side Window Panel No 3 this is to be fitted to the opposite side 3 5 3 5 3 2 Step 6 Parts needed No 2 QTY 1 No 3 QTY 1 No 5 QTY 1 Place the Back Panel No 2 the Plain Panel No 5...

Page 6: ...Parts needed No 4 QTY 2 Place the already assembled Door Panel No 4 9 10 and 11 into posi tion and fix together with the two Side Window Panels No 3 3x50mm screws per side If the door has not been ass...

Page 7: ...x200mm QTY 4 1400mm QTY 1 100mm gap between each panel 100mm gap between each panel 50mm overhang below each panel 50mm overhang below each panel 50mm overhang below each panel 50mm overhang below eac...

Page 8: ...ese panels have not been assembled yet please refer to step 10 Repeat this step for both sets of assembled roof panels No 7 8 7 8 280mm Step 15 Parts needed No 12 QTY 1 No 14 QTY 3 Fix the Roof Blocks...

Page 9: ...No 7 QTY 1 No 8 QTY 1 No 12 QTY 1 No 14 QTY 3 The use of a step ladder is essential to construct the roof To construct the Roof place the previously assembled in Step 16 6ft Roof Panel No 6 and Roof...

Page 10: ...panels and that the pointed corners meet the line that was drawn in a Step 14 The underside of the roof should look as shown 6x60mm Screws Pre drill hole 60mm screw 13 13 13 Step 20 Once all four roof...

Page 11: ...and rear of the Summer House Fix the last two remaining Eaves frames No 21 to both window sides attaching to the wall and touching the roof Make sure that the screws go into the framing behind 16x40mm...

Page 12: ...ix using felt tacks avoid felt tack already on the roof Secure all of the felt using felt tacks with even spaces of 100mm between each tack 270x Felt tacks C B A A B C 34 1 2 3 4 Step 26 Parts needed...

Page 13: ...r House using 3x30mm screws 3x30mm Screws Pre drill hole 17 33 33 17 33 33 30mm screw Step 29 Parts needed No 26 QTY 8 Fix the Cover Trims No 26 to each corner and over each join of the buiding with 3...

Page 14: ...the opening and secure the hinges to the window using 2x20mm screws per hinge Repeat this step for both window sides of the building 20x20mm Screws Pre drill hole 20mm screw 31 35 31 Step 32 Parts ne...

Page 15: ...rips No 27 28 to the top and sides of the doors frames Make sure that the edges are flush with the edge of the framing Fix with 4x30mm screws per strip 12x30mm Screws Pre drill hole 30mm screw 28 28 2...

Page 16: ...using 6x20mm screws as shown in the diagram Further secure the crosses by screw ing 1x10mm screw at each meeting point as shown in the diagram 24x20mm screws 8x10mm screws Pre drill hole 10mm screw 20...

Page 17: ...2 1 3 4...

Page 18: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...

Reviews: