Step 15

Parts needed - 

Position the slide (No.13)  on top 

of the platform and the slide 

framing (No.12) , ensure the slide 

is pushed right up to the slide 

frame and fix to the platform with 

2x40mm screws.

2 x 40mm screws

40mm 

screw

Note if fitting slide

1.  

Please keep this instruction sheet safe for future reference.

2.  

Inappropriate use or faulty application of the product is explicitly forbidden and absolves  

 

the manufacturer of all liability.

3. 

The assembly must be done by an adult.

4.  

All elements of the item should be inspected regularly for eventual wear.

5.  

This product meets to all safety aspects of the European standard EN71. It is only suitable  

 

for domestic use, both indoors and outdoors.

6.  

The product must be installed onto a playframe that is suitable for this activity (e.g.  a    

 

wooden tower). The assembly must be carried out in such a way that head, finger and    

 

clothing entrapments are excluded. In order to prevent clothing entrapments during  

 

 

gliding, there should be no openings around the platform between 3mm and 25mm. Pay  

 

special attention to the boards of the platform onto which the slide is mounted.

7.  

When mounting or assembling the product attention should be given to minimum required  

 

distance between the product and eventual obstacles: walls, fencing,... The distance should  

 

be minimum 2000mm.

8.  

In this safety area no hard, angular or pointed objects should be present. The surface    

 

underneath the product should be flat and shock absorbing, so no asphalt, concrete  

 

 

or any other hard surface.

9.  

The product must be mounted onto a suitable platform (see point 6) and only in accordance  

 

with the recommended platform height with a tolerance of approximately  50mm (see notes  

 

at the rear of the slide). The assembly must be done with 5mm or 6mm gauge countersunk.  

 

The ground level surface must be suffuciently stable to avoid subsidence and to ensure that  

 

the slide does not get damaged.

10. 

It is strongly advised not to lift the slide from the bottom after it has been fixed to the    

 platform.

11.  

To avoid the heating up of the product, do not orient the sliding surface towards the sun.

12.  

Sliding can cause a small electrostatic charge. This can be avoided by not wearing synthetic  

 

fabric  clothing and/or by regularly cleaning the surface of the slide with water and soap.

13

www.merciagardenproducts.co.uk      

4!

 

1!

2!

Pre drill 

hole

50kg

 

13

If slide is purchased, position the 

slide on the opposite side to the 

door as shown in the diagams.

Summary of Contents for 02TWR-V2-PEFC

Page 1: ...ce BUILDING A BASE Ensure the base is level and is built on firm ground to prevent distortion checking with a spirit level Refer to diagrams for the base dimensions The base should be slightly smaller...

Page 2: ...Slide Framing F100100 555mm 11 12 13 10 Slide 70mm Screw x3 50mm Screw x 34 40mm Screw x 2 30mm Screw x 8 150mm Screw x 8 100mm Screw x 19 Nail Bag Part not required if purchased slide Short Rail FC27...

Page 3: ...age the panels Tap with a flat headed screwdriver and hammer Dispose of the blocks once removed Please retain product label and instructions for future reference Please retain product label and instru...

Page 4: ...from the edge of the corner brace No 7 up to the post from both ends both measurments should be the same Make a note of the exact measurment and you can then use this as a guide for all the corner bra...

Page 5: ...k out where the corner braces need to sit on the platform No 1 and the front post No 9 Fix the two corner braces in place using 100mm screws 100mm screw 7 7 9 Step 8 Parts needed Use the measurment ta...

Page 6: ...to the floor joist Follow the steps on the seperate set of instructions to construct the playhouse 20 x 50mm Screws 50mm screw Once you have finished constructing the playhouse you can now continue t...

Page 7: ...9 1 2 Pre drill hole 1 2 Pre drill hole 50kg If slide is purchased position the slide on the opposite side to the door as shown in the diagams Please retain product label and instructions for future...

Page 8: ...0mm screws 50mm screw 5 5 www merciagardenproducts co uk P8 Step 14 Parts needed This and all further steps are for when a slide has been purchased Attach the slide framing No 12 to the side of the pl...

Page 9: ...ion to the boards of the platform onto which the slide is mounted 7 When mounting or assembling the product attention should be given to minimum required distance between the product and eventual obst...

Page 10: ...has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back Playhouse Maintenance It is recommended that the following checks and maintenance are carrie...

Reviews: