Step 16

Parts needed -             &

The safety boards (No.10 & 11)  are 

positioned to block the gaps on the 

tower’s rails and stop entrapment when 

going down the slide. Fix them in place 

using 4x30mm screws per board.

30mm 

screw

8 x 30mm screws

10

11

www.merciagardenproducts.co.uk      

1!

2!

Pre drill 

hole

50kg

 

4!

11

10

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

AFTER TREATMENT:

score around protective

 cover on glazing and

 carefuly peel

 covering back

Playhouse Maintenance:

It is recommended that the following checks and maintenance are carried out at the begin

-

ning of each season as well as at regular intervals during the usage season.

- Check all nuts /bolts/ screws for tightness and tighten when required.

- Check for movement / opening of wood giving rise to protrusion of nail heads and tips.

- Check hinges.

- Replace defective parts in accordance with the manufacturers instructions. 

- Check any crossbeams, suspensions and anchors.

- If a swing is included; check the swing seat, chains and ropes.

IF THESE CHECKS ARE NOT CARRIED OUT THE ACTIVITY TOY COULD BECOME A HAZARD

Summary of Contents for 02TWR-V2-PEFC

Page 1: ...ce BUILDING A BASE Ensure the base is level and is built on firm ground to prevent distortion checking with a spirit level Refer to diagrams for the base dimensions The base should be slightly smaller...

Page 2: ...Slide Framing F100100 555mm 11 12 13 10 Slide 70mm Screw x3 50mm Screw x 34 40mm Screw x 2 30mm Screw x 8 150mm Screw x 8 100mm Screw x 19 Nail Bag Part not required if purchased slide Short Rail FC27...

Page 3: ...age the panels Tap with a flat headed screwdriver and hammer Dispose of the blocks once removed Please retain product label and instructions for future reference Please retain product label and instru...

Page 4: ...from the edge of the corner brace No 7 up to the post from both ends both measurments should be the same Make a note of the exact measurment and you can then use this as a guide for all the corner bra...

Page 5: ...k out where the corner braces need to sit on the platform No 1 and the front post No 9 Fix the two corner braces in place using 100mm screws 100mm screw 7 7 9 Step 8 Parts needed Use the measurment ta...

Page 6: ...to the floor joist Follow the steps on the seperate set of instructions to construct the playhouse 20 x 50mm Screws 50mm screw Once you have finished constructing the playhouse you can now continue t...

Page 7: ...9 1 2 Pre drill hole 1 2 Pre drill hole 50kg If slide is purchased position the slide on the opposite side to the door as shown in the diagams Please retain product label and instructions for future...

Page 8: ...0mm screws 50mm screw 5 5 www merciagardenproducts co uk P8 Step 14 Parts needed This and all further steps are for when a slide has been purchased Attach the slide framing No 12 to the side of the pl...

Page 9: ...ion to the boards of the platform onto which the slide is mounted 7 When mounting or assembling the product attention should be given to minimum required distance between the product and eventual obst...

Page 10: ...has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back Playhouse Maintenance It is recommended that the following checks and maintenance are carrie...

Reviews: