background image

Assembly

 

Nail Bag & Ironmongery

30mm Screw x75

50mm Screw x 30

60mm Screw x2

20mm Screw x25

40mm Screw x25 

Felt Tacks x120

Wooden door 

handle

Felt

16

70mm Screw x8

Hinge x 2

17

18

30mm Black Screw x 14

Lay the door gable face up on a flat surface, place the door within the door aperture. Position the 

door so that you have a equal gap either side of the door to the gable. 

Once you are happy the door is in the correct position place a hinge at the top and bottom of the 

door, ensuring the screws will go into the framing (in cases where you have been supplied three 

hinges use the third in the middle of the door) and using 30mm black screws fix the hinge to the door 

and the door gable. Ensure to pre-drill the holes first. 

30mm Black Screw x 14

18

Remove transportation blocks 
from the bottom of each panel 
before beginning assembly. Each 
Panel should have two blocks.

Step 1

Place the floor on a firm and level base, 
ensure base has suitable drainage  free 
from areas where standing water can 
collect.  (See front page on base 
requirements).  

Step 2

11 x 50mm screws

 

Fix the corners with 3 x 50mm  

 

screw as shown in diagram.

 

Do not secure the building to the  

 

floor until the roof is fitted. Fix  

 

the panels onto the floor using  

 

50mm screws in alignment with  

 

the floor joists

Side

Back

50mm 

screw

4

2

50mm 

screw

3

Reviews: