Please retain product label and instructions for future reference

             

DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY 

COMPONENT PARTS PRIOR  TO ASSEMBLY.

www.merciagardenproducts.co.uk      P5

Step 5

Parts needed -

The Roof Support Bar (

No.10

) fits into 

position between the gables and is 

fixed into postion with 1x60mm 

screw at each end as shown. 

2x60mm screws

60mm 

screw

10

10

Step 6

Parts needed -            &           &           x2 

Fix a Roof Eave (

No. 9

) to the Large 

Roof Sheet (

No. 6) 

and the Small Roof 

Sheet (

No. 7

) using 4x30mm screws 

per eave. 

Position the roof sheets on the build-

ing and fix to the roof using 12x30mm 

screws for the Large sheet and 

10x30mm for the Small sheet. 

30x30mm Screws

30mm 

screw

7

6

9

7

6

9

Step 7

Once the roof is fitted, secure the building 

to the Floor fixing the panels onto the 

floor using 50mm screws in alignment 

with the floor joists

.

18x50mm Screws

50mm 

screw

Step 8

Cut felt into 3 sheets of 1605mm and lay 

onto Roof as shown in diagram ensuring 

there is a 50mm overhang around the 

sides. 

Fix using felt tacks at 100mm intervals.

 

80 Felt Tacks

Felt 

tacks 

1!

2!

Pre drill 

hole

1!

2!

Pre drill 

hole

1!

2!

Pre drill 

hole

1!

2!

Pre drill 

hole

1!

2!

Pre drill 

hole

Summary of Contents for 02HIDE0705-V1-PEFC

Page 1: ...hard surface BUILDING A BASE Ensure the base is level and is built on firm ground to prevent distortion checking with a spirit level Refer to diagrams for the base dimensions The base should be sligh...

Page 2: ...S AI 02HIDE0705 V1SWS Floor Large Roof Sheet 1481 x 1400mm 5 6 8 Door Small Roof Sheet 1481x990mm 7 AI 02HIDE0705 V1F PI 03 0340 PI 03 0339 AI 02HIDE0705 V1D 14 9 10 11 12 13 Roof Eave 1481mm Roof Sup...

Page 3: ...o uk P3 Pre Assembly Before assembling remove the transportation blocks from the bottom of each panel Take care removing the blocks as to not damage the panels Tap with a flat headed screwdriver and h...

Page 4: ...the door gable on all four sides Use a12mm strip to help keep the 12mm gaps Once you are happy the door is in the correct position place a Hinge No 20 at the top and bottom of the door and fix using 7...

Page 5: ...g 4x30mm screws per eave Position the roof sheets on the build ing and fix to the roof using 12x30mm screws for the Large sheet and 10x30mm for the Small sheet 30x30mm Screws 30mm screw 7 6 9 7 6 9 St...

Page 6: ...rews as shown 2x20mm screws per Window strip 56x20mm Screws 20mm screw 13 14 13 13 16 17 x14 x8 x8 x8 x4 15 14 13 16 17 Step 12 Parts needed Place the Wooden Door Handle No 19 on the outside of the do...

Page 7: ...d that the following checks and maintenance are carried out at the begin ning of each season as well as at regular intervals during the usage season Check all nuts bolts screws for tightness and tight...

Reviews: