Felt
tacks
P 7
Please retain product label and instructions for future reference
Step 16
Roll the Felt (
No. 31
) from front to back leaving
a 50mm felt overlap to the front, back and
sides. Secure with felt tacks at 100mm
intervals.
Use a final fourth peice of felt along the Apex
of the building as shown.
110x Felt Tacks
Step 17
Fix the Fascias (
No. 14 & No.15
) using
3x40mm screws per board.
Fix the Finials(2x
No. 25
) with 2x40mm
screws per Finial as shown.
16x 40mm screws.
2
4
3
1
Step 18
Fix the Window Crosses (
No. 26
) into
position using 4x20mm screws per
Window Cross.
32x 20mm screws.
14
15
14
15
25
26
Pre drill
hole
40mm
screw
Pre drill
hole
20mm
screw
Summary of Contents for 02BRAM0806-V3-PEFC
Page 9: ......