background image

70mm 

screw

100mm 

screw

Step 11

Place a Truss central to where two 

panels join. Align the top of the 

truss with the top of the sides as 

shown in the diagram.

Tip - Use a piece from the fixing kit 

as a guide.

Pencil mark the truss position and 

remove truss.

Place the truss blocks up to the 

pencil mark and fix using 2x70mm 

screws per block.

Place the truss back into position on 

top of the support block and secure 

using 100mm screw each side from 

the top down through the truss and 

into the block.

4x70mm Screws

2x100mm Screws

14

Pre drill 

hole

Pre drill 

hole

11

11

*

Cut down trims to fit

Using x3 strips (No. 20) cut two trims at 

1783mm 

and 

one strip at 

1445mm

Place the smaller strip (1445mm) centrally above the 

door aperture (

allowing a space of 10mm between the 

strip and the top of the door opening

) and fix into 

position using 3x30mm screws. 

Align the larger strips (1783mm) either side of the first 

smaller strip and fix each one into position using 

3x30mm screws. This will allow a space of 

approximately 10mm between the trims and the 

opening.

*

Please note: This 10mm gap allows the doors to sit 

onto the gable NOT into the aperture.

Fix the T Hinges onto the front of the doors; aligning 

each hinge to the framing on the back of each door. 

Secure the doors onto the assembled gable as shown 

in the illustration. Ensuring that the screws go through 

the cladding and into the framing behind.

51x30mm Screws

Step 10

30mm 

screw

Pre drill 

hole

19

19

19

20

10mm

gap

Summary of Contents for 01SHPWOR1010DDOW-V2

Page 1: ...treated with a water based treatment this only helps to protect the product during transit and for upto 3 months against mould To validate your guarantee and ensure longevity of the product it is ESS...

Page 2: ...m Qty 1 Cover Trim 1757mm Qty 11 18 Finial Qty 2 21 20 T Hinge Qty 6 Felt 24 25 Casement stay QTY 2 Butt hinge QTY 4 22 26 23 Tower Bolt QTY 2 27 7 10 Door QTY 2 16 Door Gable Strip 2552mm Cover Strip...

Page 3: ...m screws 5x40mm Screws 40mm screw Pre drill hole Plain Gable Assembly Step 3 12 x 50mm screws Lay the Back Left Gable and Back Right Gable on a level floor place them next to each other ensure they ar...

Page 4: ...hole 8 Step 4 Do not secure the building to the floor until the roof is fitted Fix the corners with 50mm screws as shown in diagram Position the panels so there is equal spacing between the floor and...

Page 5: ...crew Pre drill hole Step 8 Fix the Door Gable refer to steps 1 and 2 if you have not already assembled this at the corners with 50mm screws as shown in diagram 6x50mm Screws 50mm screw Pre drill hole...

Page 6: ...83mm and one strip at 1445mm Place the smaller strip 1445mm centrally above the door aperture allowing a space of 10mm between the strip and the top of the door opening and fix into position using 3x3...

Page 7: ...and fix using 40mm screws Ensure there is an equal amount of overhang on either side of the roof 12x40mm Screws 40mm screw Pre drill hole Place the second roof sheet ontop of the truss and ensure that...

Page 8: ...l hole HANDLE WITH CARE 1 2 3 4 170 x felt tacks Cut four strips of felt and place onto the roof See below for sizes Place the felt flat onto the roof in the order that is stated on the diagram below...

Page 9: ...where the two back gables join using 4x40mm screws Pre drill to avoid splitting 28x40mm Screws 19 17 17 40mm screw Pre drill hole 16x40mm Screws Fit the fascias to the roof over the felt and secure i...

Page 10: ...x the opening windows instead of fixing butt hinges to the opening window use 4x30mm screws to attach the opening windows to the window panel as shown in the diagram 3x30mm Screws SCREW COUNT PER WIND...

Page 11: ...hem down using 12 x 20mm screws 6x20mm screws per casement stay 22 Step 21 Step 20 To fix the lock in place Screw the Staple to the Door Gable or Slave door Making sure the Hasp is in line with the st...

Page 12: ...P 12 It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back...

Reviews: