background image

c

Step 18

Step 19

19

28

30mm
16mm

Opening Window

Fixed Window

30mm 

screw

30mm 

screw

16mm 

screw

30mm 

screw

25

Place the cover strip 11mm above the 

window gap in the window panel and 

fix with 3x30mm screws per strip.

Measure and trim before fitting.

If you would like the windows to be 

opening use the butt hinges to 

attach the opening window strip 

and the opening window together.

Use 30mm screws to fix the butt 

hinge to the Window Strip and 

16mm screws to fix it to the 

Opening Window.

If you want to fix the opening 

windows, instead of fixing butt 

hinges to the opening window, 

use 4x30mm screws to attach 

the opening windows to the 

window panel as shown in the 

diagram.

3x30mm Screws

*SCREW COUNT PER WINDOW

6x30mm Screws
6x16mm Screws

4x30mm Screws

*

Cut down trims to fit

30mm 

screw

Pre drill 

hole

19

Place the Cloaking Strip to the 

rear of one of the doors. Fixing in 

position screwing through the door  

into the cloaking strip with 3x30mm

screws.

Align the tower bolts onto the

vertical framing of the slave

door, secure the bolts to the

top and bottom using 6x30mm

black screws per tower bolt.

Mark the position of the bolt

& drill a hole above and below

for the bolt to catch in to.

15x30mm Black Screws

26

29

Summary of Contents for 01SHPWOR1010DDOW-V2

Page 1: ...treated with a water based treatment this only helps to protect the product during transit and for upto 3 months against mould To validate your guarantee and ensure longevity of the product it is ESS...

Page 2: ...m Qty 1 Cover Trim 1757mm Qty 11 18 Finial Qty 2 21 20 T Hinge Qty 6 Felt 24 25 Casement stay QTY 2 Butt hinge QTY 4 22 26 23 Tower Bolt QTY 2 27 7 10 Door QTY 2 16 Door Gable Strip 2552mm Cover Strip...

Page 3: ...m screws 5x40mm Screws 40mm screw Pre drill hole Plain Gable Assembly Step 3 12 x 50mm screws Lay the Back Left Gable and Back Right Gable on a level floor place them next to each other ensure they ar...

Page 4: ...hole 8 Step 4 Do not secure the building to the floor until the roof is fitted Fix the corners with 50mm screws as shown in diagram Position the panels so there is equal spacing between the floor and...

Page 5: ...crew Pre drill hole Step 8 Fix the Door Gable refer to steps 1 and 2 if you have not already assembled this at the corners with 50mm screws as shown in diagram 6x50mm Screws 50mm screw Pre drill hole...

Page 6: ...83mm and one strip at 1445mm Place the smaller strip 1445mm centrally above the door aperture allowing a space of 10mm between the strip and the top of the door opening and fix into position using 3x3...

Page 7: ...and fix using 40mm screws Ensure there is an equal amount of overhang on either side of the roof 12x40mm Screws 40mm screw Pre drill hole Place the second roof sheet ontop of the truss and ensure that...

Page 8: ...l hole HANDLE WITH CARE 1 2 3 4 170 x felt tacks Cut four strips of felt and place onto the roof See below for sizes Place the felt flat onto the roof in the order that is stated on the diagram below...

Page 9: ...where the two back gables join using 4x40mm screws Pre drill to avoid splitting 28x40mm Screws 19 17 17 40mm screw Pre drill hole 16x40mm Screws Fit the fascias to the roof over the felt and secure i...

Page 10: ...x the opening windows instead of fixing butt hinges to the opening window use 4x30mm screws to attach the opening windows to the window panel as shown in the diagram 3x30mm Screws SCREW COUNT PER WIND...

Page 11: ...hem down using 12 x 20mm screws 6x20mm screws per casement stay 22 Step 21 Step 20 To fix the lock in place Screw the Staple to the Door Gable or Slave door Making sure the Hasp is in line with the st...

Page 12: ...P 12 It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back...

Reviews: