P 3
Please retain product label and instructions for future reference
Pre Assembly
Before assembling remove the transportation
blocks from the bottom of each panel.
Take care removing the blocks as to not damage
the panels. Tap with a flat headed screwdriver
and hammer.
Dispose of the blocks once removed.
21 x 30mm screws
Fix the T Hinges onto the
doors and door frame as
shown. Ensure that the
screws go through the
cladding and into the
framing behind.
1
13
30
Pre Assembly
Step 1
Place floor on a firm and level base, ensure
base has suitable drainage free from areas
where standing water can collect.
(See front page on base requirements).
The door and plain panels are
interchangeable and can be
positioned in a variety of
configurations, Decide which works
best before assembly .
(see end of step 3)
Fix the corner with 3x 50mm screw a
shown in diagram.
Do not secure the building to the floor
until the roof is fitted. Fix the panels
onto the floor using 50mm screws in
alignment with the floor joists.
7 x 50mm screws
Step 2
50mm
screw
2
Pre drill
hole