Mercia Garden Products 01PTOSBA1006DDFW-V1 General Instructions Manual Download Page 4

P  11

Step 5

i)Position a truss frame to the 

ridge bar sloping down towards 

the building side, ensure it is 

central to the middle upright of 

the panel. Fix with a 50mm screw 

through the ridge bar into the 

truss frame. 

ii) Align the second truss frame 

with the first on the opposite side 

of the ridge bar and fix with a 

50mm screw at an angle as 

illustrated.

ENSURE SUPPORT BARS 

ARE MANUALLY SUP-

PORTED UNTIL FIXED AT 

BOTH ENDS

i

ii

4x50mm Screws

Pre drill 

hole

50mm 

screw

9

9

Step 6

i) Fix the truss block to the side 

panel framing with 2 x 50mm 

screws. Position the block at the 

top of the framing with the 

angle pointing upwards into the 

building, aligning the block 

centrally along the join between 

the side panels with one screw 

in each panel.

ii) Fix the support bar to the 

block using 1 x 50mm screw.

ii

i

11

6x50mm Screws

Pre drill 

hole

50mm 

screw

11

11

Step 7

Fix a Truss support 

between the two truss 

frames and fix in place 

using 40mm screws, 

ensure you pre-drill 

holes before fixing 

together.

4x40mm Screws

40mm 

screw

Pre drill 

hole

12

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

Step 8

Place two roof sheets 

ontop of the plain gable 

and truss.

Before fixing the roof 

sheet to the truss frame 

make sure the edge of 

the roof sheet sits in the 

middle of the truss frame 

then fix using 40mm 

screws.

32x40mm Screws

8x30mm Screws

Fix the eaves frame to the 

roof sheet using 3x30mm 

screws for each sheet. 

b

b

40mm 

screw

Pre drill 

hole

6

18

Summary of Contents for 01PTOSBA1006DDFW-V1

Page 1: ...as soon as possible and annually to prevent the timber from deteriorating and to waterproof it This is required to maintain the anti rot guarantee Dip Treated buildings Require a preservative treatme...

Page 2: ...972MM Eaves Frame 28x28x1502mm Qty 4 FS2828 1502MM Truss Block 27x44x140mm Qty 2 F2744 160MM Door Block 28x28x140mm Qty 2 FS2828 140MM Fascia 12x60x1016mm Qty 4 S1260 1016MM Door Strip 12x60x1016mm Q...

Page 3: ...6x50mm Screws Pre drill hole 50mm screw Step 3 12x50mm Screws Fix the corners with 50mm screws as shown in diagram 1 4 4 Use for no window buildings 3 Use for no window buildings 3 Pre drill hole 50m...

Page 4: ...ith the angle pointing upwards into the building aligning the block centrally along the join between the side panels with one screw in each panel ii Fix the support bar to the block using 1 x 50mm scr...

Page 5: ...sing 3x30mm screws for each sheet b b 40mm screw Pre drill hole 6 18 Step 10 Once the roof is fixed attatch the building to the floor with 70 mm screws 24 x 70mm Screws b b b b b b b b b b b b b 70mm...

Page 6: ...ws 2x30mm Black Screws 17 30mm screw Pre drill hole a a b 30mm screw Step 13 16 16 16 16 16 16 Fit the cover trims to the building and secure in place with 40mm screws as shown Pre drill to avoid spli...

Page 7: ...e sheets on top of the window cill When positioning the styrene sheets ensure there is an equal distance between them and at either side of the windows Fix the window strips to the two pieces of frami...

Page 8: ...It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back P 15...

Reviews: