Mercia Garden Products 01PTOSBA1006DDFW-V1 General Instructions Manual Download Page 3

P 10

Step 1

5

5

12x40mm screws

Place floor on firm and level base, ensure 

base has suitable drainage free from areas 

where water can collect. (See front page on 

base requirements). 

Attach the floors using 12 x 40mm screws

Do not secure the building to the 

floor until the roof is fitted. Fix the 

panels onto the floor using 50mm 

screws in alignment with the floor 

joists

Fix the corners with 50mm screws 

as shown in diagram.

Position the panels so there is equal spacing 

between the floor and cladding on all 4 sides

Step 2

3

3

2

6x50mm Screws

Pre drill 

hole

50mm 

screw

Step 3

12x50mm Screws

Fix the corners with 50mm 

screws as shown in diagram.

1

4

4

Use         for no 

window buildings

3

Use         for no 

window buildings

3

Pre drill 

hole

50mm 

screw

Step 4

26

8

8

23

23

Ridge Bar Assembly

Position the two parts of the 

ridge bar within the ‘U’ 

channel and secure from 

either side with 3 x 30mm 

screws and 4 x 30mm screws 

from underneath. Secure an 

‘L’ bracket to either end of 

the ridge bar using 2 x 

30mm screws per bracket.

18x30mm Screws

Place the roof support bar 

in between the front and 

back panels. Ensure the top 

corners of the support bar 

are flush with each top 

point. Secure in place using 

the L Bracket on each end 

with 4x30mm screws.

30mm 

screw

Pre drill 

hole

Summary of Contents for 01PTOSBA1006DDFW-V1

Page 1: ...as soon as possible and annually to prevent the timber from deteriorating and to waterproof it This is required to maintain the anti rot guarantee Dip Treated buildings Require a preservative treatme...

Page 2: ...972MM Eaves Frame 28x28x1502mm Qty 4 FS2828 1502MM Truss Block 27x44x140mm Qty 2 F2744 160MM Door Block 28x28x140mm Qty 2 FS2828 140MM Fascia 12x60x1016mm Qty 4 S1260 1016MM Door Strip 12x60x1016mm Q...

Page 3: ...6x50mm Screws Pre drill hole 50mm screw Step 3 12x50mm Screws Fix the corners with 50mm screws as shown in diagram 1 4 4 Use for no window buildings 3 Use for no window buildings 3 Pre drill hole 50m...

Page 4: ...ith the angle pointing upwards into the building aligning the block centrally along the join between the side panels with one screw in each panel ii Fix the support bar to the block using 1 x 50mm scr...

Page 5: ...sing 3x30mm screws for each sheet b b 40mm screw Pre drill hole 6 18 Step 10 Once the roof is fixed attatch the building to the floor with 70 mm screws 24 x 70mm Screws b b b b b b b b b b b b b 70mm...

Page 6: ...ws 2x30mm Black Screws 17 30mm screw Pre drill hole a a b 30mm screw Step 13 16 16 16 16 16 16 Fit the cover trims to the building and secure in place with 40mm screws as shown Pre drill to avoid spli...

Page 7: ...e sheets on top of the window cill When positioning the styrene sheets ensure there is an equal distance between them and at either side of the windows Fix the window strips to the two pieces of frami...

Page 8: ...It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back P 15...

Reviews: