![Mercia Garden Products 01PTOSBA0305SDNW-V1 General Instructions Manual Download Page 5](http://html1.mh-extra.com/html/mercia-garden-products/01ptosba0305sdnw-v1/01ptosba0305sdnw-v1_general-instructions-manual_1772680005.webp)
7
P 5
Please retain product label and instructions for future reference
Step 8
Cut the felt (
No. 15
) into one sheet
and lay onto the roof as shown in
the illustration.
*Ensure there is approximately
50mm of overhanging felt around
the building.
Fix the felt onto the building using
38x felt tacks at 100mm intervals.
Felt size: 1844mm
38x felt tacks.
Pre drill
hole
50mm
screw
Step 9
Fit the cover trims (
No.7
) over the
corners and secure in place using
3x30mm screws per cover trim.
*Ensure the cover trims are fitted
with the bottom flush to the bottom
of the gable boarding.
12x30mm screws
Pre drill
hole
30mm
screw
Step 10
Attach the facias (
No.8
) to the roof
leaving a slight overhang at the top
and ensuring the facias meet the
eaves frame.
Attch the shed diamond finial
(
No.11
) over the facias centrally.
Screw the facias on over the felt to
secure in place with 40mm screws as
shown in the diagram.
12x40mm screws
Pre drill
hole
40mm
screw
HANDLE
WITH CARE
1
2
3
4
15
7
7
7
8
8
8
8
11
11