![Mercia Garden Products 01PTOSBA0305SDNW-V1 General Instructions Manual Download Page 4](http://html1.mh-extra.com/html/mercia-garden-products/01ptosba0305sdnw-v1/01ptosba0305sdnw-v1_general-instructions-manual_1772680004.webp)
Step 4
Place the plain gable (
No.3
)
and the assembled door
gable (
No.1
) on to the floor
and fix the corners together
using 3x50mm screws per
corner.
Do not secure the building to
the floor until the roof is
secured in place.
*Ensure the door gable is fitted on
the inside of the plain panel. Screw
through the door gable framing
into the framing of the plain panel.
9x50mm screws
Pre drill
hole
50mm
screw
Step 5
Place the ridge bar (
No.10
) between
the plain and door gable. Ensure the
top corners of the ridge bar sit flush
with the top point of the gables.
Fix the ridge bar to the the gables
using an L bracket (
No.12
) and
4x20mm screws per bracket.
8x20mm screws
Pre drill
hole
20mm
screw
Step 6
Fix both eaves frame (
No.9
) to the
edge of both roof panels (
No.5
)
taking care to attach the eaves
frames to the edge of the roof panel
that matches their lengths.
Fix the roof sheets to the roof
ensuring they come together at the
top using 10x40mm screws per roof
sheet.
*Ensure to screw the roof sheets
into the framing of the panels and
the ridge bar.
24x40mm screws
Pre drill
hole
40mm
screw
Step 7
Once the roof has been fully secured
the building can be fixed to the floor.
Screw down through the framing of
the panels and into the floor bearers
using 2x50mm screw for the side
panels and 3x50mm screws for the
gables.
10x50mm screws
Pre drill
hole
50mm
screw
3
1
5
5
9
5
P 4
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Please retain product label and instructions for future reference
10
12
12
10
12