P 6
10mm Felt Tags
100mm
intervals
50mm
Overhang
Cut
felt
into 4 sheets and lay
onto roof as shown in
diagram ensuring there is a
50mm overhang around the
sides.
Fix using felt tacks at 100mm
intervals
Step 9
5
1
14
4
4
Step 10
Use 30mm screws to fix
each
cover trim
.
18x 30mm Screws
1
4
5
10
10
10
Step 11
Use 40mm screws to fix
each
fascia block, fascia
and
Shed Diamond
.
4
4
1
25
9
18x 40mm Screws
15
15
Step 12
To fix the lock in place. Screw the Staple
to the Door Gable or Slave door.
Making sure the Hasp is in line with
the staple and screw into the Door or
Master door.
To lock the Door, place the Hasp over the
Staple and twist into the lock position as
shown.
8x30mm screws.
Pre drill
hole
30mm
screw
Please retain product label and instructions for future reference