background image

P 5

Step 8

Once the roof is fixed,

secure the building to the

floor with 24x50mm screws.

* Ensure to screw in alignment

with the floor bearers.

30x50mm Screws

Pre drill 

hole

50mm 

screw

Step 6

Fix the

 roof

 panels on either 

side as shown in diagram. 

Ensure roof framing fits into slot 

at top between the gable top 

rafters and the 

roof truss

Fix panels into position using 

30x 30mm screws from the top 

of panel, straight into the rafter 

and roof truss. Pre drill holes 

before hand.

Ensure the larger over hang on 

both panels are facing each 

other at the top point.

40x 30mm Screws

5

1

4

4

4

4

12

*Secure the truss support 51mm from the top edge.     

14

Fix the last two truss supports

to the assembly with 2x40mm

screws per side.

4x40mm Screws

11

11

Attach the truss blocks to each side

of the support with 1x60mm

screw per block.

2x50mm Screws

Pre drill 

hole

50mm 

screw

12

11

*

Secure the first 2 truss 

supports together with

4x40mm screws as shown

in the illustration.

4x40mm Screws

40mm 

screw

Step 5

Pre drill 

hole

50mm 

screw

Fix the assembled truss inbetween

the panels, approximately half

way between the gables, and secure

using 4x50mm screws.

4x50mm screws

Step 7

Please retain product label and instructions for future reference

             

Summary of Contents for 01PTGRO1208DD-V3

Page 1: ...to prevent the timber from deteriorating and to waterproof it This is required to maintain the anti rot guarantee Dip Treated buildings Require a preservative treatment to protect against rot and dec...

Page 2: ...trip 12 x 44 x 1732mm QTY 2 S1245 1732MM Window Strip 12 x 45 x 1055mm QTY 2 S1245 1055MM 22 T Hinge QTY 6 PI 02 1045 23 Butt Hinge QTY 4 PI 07 0066 25 Nail Bag Casement Stay x2 PI 07 0007 138x30mm Sc...

Page 3: ...w If you want to fix the opening windows instead of fixing butt hinges to the opening window use 4x30mm screws to attach the opening windows to the window panel as shown in the diagram SCREW COUNT PER...

Page 4: ...xing positions along the length of the floors Step 3 Do not secure the building to the floor until the roof is fitted Fix the panels onto the floor using 50mm screws in align ment with the floor joist...

Page 5: ...panels are facing each other at the top point 40x 30mm Screws 5 1 4 4 4 4 12 Secure the truss support 51mm from the top edge 14 Fix the last two truss supports to the assembly with 2x40mm screws per...

Page 6: ...4 5 10 10 10 Step 11 Use 40mm screws to fix each fascia block fascia and Shed Diamond 4 4 1 25 9 18x 40mm Screws 15 15 Step 12 To fix the lock in place Screw the Staple to the Door Gable or Slave door...

Page 7: ...rotective cover on glazing and carefuly peel covering back 30mm screw Pre drill hole 19 Place the Cloaking Strip to the rear of one of the doors Fixing in position screwing through the door into the c...

Reviews: