background image

Step 2

Place the floor panels

onto a firm & level base,

ensure the base has

suitable drainage free

from areas where 

standing water can 

collect.

Secure the floors 

together using 10x50mm

screws fixing in an

alternating pattern.

10x50mm Screws

Pre drill 

hole

50mm 

screw

Step 3

Place the plain 

gable and the 

window panels 

onto the floor 

and secure using 

6x50mm screws.

b

b

b

b

b

b

b

b

DO NOT

 secure 

the building to 

the floor until the 

roof is fixed in 

place.

6x50mm Screws

Pre drill 

hole

50mm 

screw

5

5

2

3

3

* Window panels can

be placed on either

side of the building.

Using the same method outlined

in Step 3, fix the plain sides & the

door gable using 12x50mm

screws.

DO NOT

 secure the building to

the floor until the roof is

fixed in place.

b

b

b

b

b

Step 4

12x50mm Screws

Pre drill 

hole

50mm 

screw

4

1

4

10

Pre drill 

hole

40mm 

screw

*Secure the truss support 43mm from the top edge.     

19

Fix the last two truss supports

to the assembly with 2x40mm

screws per side.

4x40mm Screws

Pre drill 

hole

40mm 

screw

20

20

Attach the truss blocks to each side

of the support with 1x60mm

screw per block.

2x50mm Screws

Pre drill 

hole

50mm 

screw

P 3

Please retain product label and instructions for future reference

             

10

11

*

Step 5

Secure the first 2 truss 

supports together with

4x40mm screws as shown

in the illustration.

4x40mm Screws

Reviews: