P 3
Please retain product label and instructions for future reference
Pre Assembly
Before assembling remove the transportation
blocks from the bottom of each panel.
Step 1
Place the two floors onto a firm and level
base upside down.
Secure the floors together using 3x50mm
screws, fixing in an alternating pattern
as shown in the illustration.
Once fitted, turn the floor assembly the
right way up.
Ensure the base has suitable drainage & is
free from areas where standing water can
collect.
3x50mm Screws
5
5
Pre drill
hole
50mm
screw
2
4
4
Step 2
Place the back panels and the
right gable onto the floor and
secure in place using 6x50mm
screws.
Do
not
secure to the floor until
the roof is fixed.
6x50mm Screws
a
b
a
a
a
a
b
b
b
b
b
b
Pre drill
hole
50mm
screw
Step 3
Following the same method
outlined in step 2, place the
front panel and the left gable
onto the floor and secure in
place using 6x50mm screws.
Do
not
secure to the floor until
the roof is fixed.
6x50mm Screws
a
b
Pre drill
hole
50mm
screw
a
a
a
a
a
a
b
b
b
*The door opening can be positioned
at either side of the building depending
on your needs and preferences.
3
1