P 3
Please retain product label and instructions for future reference
Pre Assembly
Before assembling remove the transportation
blocks from the bottom of each panel.
Take care removing the blocks as to not damage
the panels. Tap with a flat headed screwdriver
and hammer.
Dispose of the blocks once removed.
4
9
3
16
Step 1
Parts needed - No. 3 QTY 1
No. 9 QTY 1
No. 16 QTY 3
Fix the T Hinges (No.16) onto the
door (No.9) and door frame (No.3) in
line with the door blocks.
21x30mm screws.
Pre drill
hole
30mm
screw
Step 2
Parts needed - No. 4 QTY 1
Place the floor (No. 4) on a firm and level
base, ensure base has suitable drainage
free from areas where standing water can
collect. (See front page on base
requirements).
Step 3
Parts needed - No. 1 and/or 2
** Please note: The side panels
are all interchangeable and can
be positioned in a variety of
configurations, Decide which
works best before assembly. (see
end of step 12)
Fix the corners with 3x
50mm screw a shown in diagram.
Do not secure the building
to the floor until the roof is fitted.
Fix the panels onto the floor using
50mm screws in alignment with
the floor joists.
10x50mm screws.
50mm
screw
Pre drill
hole