![Mercia Garden Products 01JER0806-V1 Manual Download Page 2](http://html1.mh-extra.com/html/mercia-garden-products/01jer0806-v1/01jer0806-v1_manual_1772449002.webp)
Before assembly fix the hinges
to the door gable using
7x30mm screws for each one.
Pre Assembly
21x30mm Screws
Before assembly fix each
Beading Strip to the door
gable using 4x30mm screws
for each one.
8x30mm Screws
Pre Assembly
10
7
19
Lay the door gable down on a flat surface
before fitting the window strip and window.
30mm
screw
Place the opening window strip
11mm above the window gap in the
window panel and fix with 3x30mm
screws.
3x30mm Screws
*SCREW COUNT PER WINDOW
30mm
16mm
30mm
screw
16mm
screw
If you would like the windows to be
opening use the butt hinges to
attach the opening window strip
and the opening window together.
Use 30mm screws to fix the butt
hinge to the Window Strip and
16mm screws to fix it to the
Opening Window.
8x30mm Black Screws
8x16mm Black Screws
13
20
14