P 3
Please retain product label and instructions for future reference
Nail Bag
50mm Screw x 32
40mm Screw x 12
Felt Tacks x 170
20mm Screw x 12
30mm Screw x 128
16mm Screw x 12
Step 1
Fit the door frame onto the
door gable using 4x30mm
screws for each strip. The
door frames should sit
15mm from the door
aperture.
12x30mm Screws
15mm
13
14
30mm
screw
Pre drill
hole
42x30mm screws
Step 2
Fix the T-hinges onto the
doors and door frame as
shown. using 30mm
screws. Ensure that each
hinge is fixed to the doors
going through to the
framing.
4
5
23
Pre drill
hole
30mm
screw
Remove transportation blocks
from the bottom of each panel
before beginning assembly.
Each panel should have two
blocks.
Step 3