P 3
Please retain product label and instructions for future reference
21x30mm screws
Step 1
Fix the T-hinges onto the
door and door gable as
shown. using 30mm
screws. Ensure that each
hinge is fixed to the doors
going through to the
framing.
16
Pre drill
hole
30mm
screw
7
Remove transportation blocks
from the bottom of each panel
before beginning assembly.
Each panel should have two
blocks.
Step 2
5
Place the floor on a firm and
level base, ensure base has
suitable drainage free from
areas where standing water
can collect. (See front page for
base requirements).
Step 3
Fix the corner with 3x
50mm screws as shown in
diagram.
Step 4
50mm
screw
Pre drill
hole
The window panel can be fitted
on either the left or right hand
side of the building.
3x50mm screws
2
3