background image

P 3

Please retain product label and instructions for future reference

             

21x30mm screws

Step 1

Fix the T-hinges onto the 

door and door gable as 

shown. using 30mm 

screws. Ensure that each 

hinge is fixed to the doors 

going through to the 

framing.

16

Pre drill 

hole

30mm 

screw

7

Remove transportation blocks 

from the bottom of each panel 

before beginning assembly. 

Each panel should have two 

blocks.

Step 2

5

Place the floor on a firm and 

level base, ensure base has 

suitable drainage  free from 

areas where standing water 

can collect.  (See front page for 

base requirements). 

Step 3

Fix the corner with 3x 

50mm screws as shown in 

diagram.

Step 4

50mm 

screw

Pre drill 

hole

The window panel can be fitted 

on either the left or right hand 

side of the building.

3x50mm screws

2

3

Reviews: