Please retain product label and instructions for future reference

             

30mm 

screw

Pre drill 

hole

Step 12

Parts needed - No. 18 QTY 2

Position a Roof Support Bar 

(No. 18), 

centrally underneath the join of the two 

roof panels 

(No. 9) 

internally.  Ensure the 

Roof Support Bar 

(No. 18) 

sits flush to the 

underside of the roof panels and flush at 

the top as shown in the illustration.

Fix the Roof Support Bar 

(No. 18)

 in place   

using 30mm screws fixing through the 

roof panel 

(No. 9)

 into the Roof Support 

Bars 

(No. 18) 

from the outside of the 

building.

*Alternate screwing through each roof 

panel for a more secure hold.

10x30mm Screws

18

18

18

18

Step 13

Parts needed - No. 19 QTY 2

 

 

   No. 20 QTY 2

Place Roof Block B 

(No. 20) 

under the top 

framing of the panel directly below the 

Roof Support Bar 

(No. 18).

 Fix the block 

by screwing through the outside of the 

panel with 2x30mm screws. 

Then place Roof Block A 

(No. 19) 

ontop of 

the Roof Block B 

(No. 20), 

angled cut 

edge facing upwards, flush to the Roof 

Support Bar 

(No. 18). 

Fix in place with 

2x50mm screws. 

Repeat the above two actions on either 

side of the building. 

4x30mm Screws

4x50mm Screws

30mm 

screw

Pre drill 

hole

50mm 

screw

19

19

19

20

Summary of Contents for 01DTSHRAX1006SDFW-V1

Page 1: ...g damage to the building TIMBER As with all natural materials timber can be affected during various weather conditions For the duration of heavy or extended periods of rain swelling of the wood panels...

Page 2: ...in Panel 1760mm Wide AI S11SHPPTF1760X1802 V1 Qty 1 Gable Top AI S11SHAGT1760X391 V1 Qty 2 Floor AI R11MBF1456X1753 V1 Qty 2 Roof AI S11MBOHAR1029X1471 V1 Qty 4 Door AI S11FBMBZBD743X1680 V1 Qty 1 Fas...

Page 3: ...1 Parts needed No 1 QTY 1 No 7 QTY 1 No 26 QTY 3 Place the door No 7 within the Door Panel No 1 Fix the T Hinges No 26 onto the door and Door Panel as shown taking into account on which side of the Do...

Page 4: ...fore fixing screws Step 4 Parts needed No 3 or 1 or 2 or 5 QTY 1 No 5 or 1 or 2 or 3 QTY 1 Fix the corners of the Smallest Plain Panel No 3 and the Fourth Plain Panel Panel No 6 or panel of your choic...

Page 5: ...Panel No 4 with 50mm screws as shown in diagram Do not secure the building to the floor until the roof has been fitted Position the panels so there is equal spacing between the floor and cladding on...

Page 6: ...Gable Tops No 8 and on top of the Ridge Bar No 11 Make sure that you have got the roof panels the correct way round with the recess at the top of the apex as shown in the diagram The edges of the roo...

Page 7: ...Support Bars No 18 from the outside of the building Alternate screwing through each roof panel for a more secure hold 10x30mm Screws 18 18 18 18 Step 13 Parts needed No 19 QTY 2 No 20 QTY 2 Place Roo...

Page 8: ...in position fix the Roof Support Brace No 21 in place with 2x40mm screws at each end of the brace 4x40mm Screws 40mm screw Pre drill hole Pre drill hole 40mm screw Step 15 Use 40mm screws to fix the...

Page 9: ...outside edges When positioning the styrene sheets ensure there is an equal distance on all sides Attach 1x Outer Window Strip No 14 along the top of the window opening Followed by attaching 3x Outer...

Page 10: ...tting Followed by adding the Finials No 25 over the Fascias using x2 40mm screws per Finial 16x40mm Screws 40mm screw Pre drill hole 12 12 25 12 25 12 Use 4x30mm Screws to fix each Door Beading Strip...

Page 11: ...drill hole 30mm screw 29 Step 23 Parts needed No 24 QTY 2 Fix the Turn Button No 24 onto the Door Panel No 1 using 1x30mm screw for each one These turn buttons help to keep your doors straight during...

Page 12: ...2 1 3 4...

Page 13: ...1 2...

Reviews: