P 4
Please retain product label and instructions for future reference
Step 2
Parts needed - No. 10 QTY 2
Place the floor panels
(No. 10)
onto a firm
and level base. Ensure the base has suitable
drainage, free from areas where standing
water can collect.
Secure the floors together using 8x50mm
screws through the floor bearers in an
alternating pattern.
8x50mm Screws
Pre drill
hole
50mm
screw
10
10
IMPORTANT:
Pre-drill before fixing screws.
50mm
screw
Pre drill
hole
6
3
Step 3
Parts needed - No. 3, (or 1, or 2, or 5 QTY 1)
No. 6 QTY 1
**Please note: The side panels are all
interchangeable and can be positioned in
a variety of configurations. Decide which
works best before assembly. See Page 2 for
suggested options.**
Fix the corners of the Fourth Plain Panel
(No. 6)
and the Smallest Plain Panel
(No. 3)
(or panel of
your choice) with 50mm screws as shown in
diagram.
Do not secure the building to the floor until the
roof has been fitted.
Position the panels so there is equal spacing
between the floor and cladding on all sides.
3x50mm Screws
a
a
a
a
IMPORTANT:
Pre-drill before fixing screws.
Step 4
Parts needed - No. 3, (or 1, or 2, or 5 QTY 1)
No. 5, (or 1, or 2, or 3 QTY 1)
Fix the corners of the Smallest Plain Panel
(No. 3)
and the Fourth Plain Panel Panel
(No. 6)
(or panel of your choice) with 50mm screws as
shown in diagram.
Fix the end of the Third Plain Panel
(No. 5)
(or panel of your choice) to the already standing
chosen panel with 50mm screws as shown in
the diagram.
Do not secure the building to the floor until the
roof has been fitted.
Position the panels so there is equal spacing
between the floor and cladding on all sides.
6x50mm Screws
50mm
screw
Pre drill
hole
3
5
a
a
a
a
IMPORTANT:
Pre-drill before fixing screws.
Step 5
Parts needed - No. 2, (or 1, or 3, or 5 QTY 1)
No. 5, (or 1, or 2, or 3 QTY 1)
Fix the end of the Third Plain Panel
(No. 5)
(or panel of your choice) to the already
standing chosen panel with 50mm screws
as shown in the diagram.
Fix the end of the Window Panel
(No. 2)
(or
panel of your choice) to the already standing
chosen panel with 50mm screws as shown in
the diagram.
Do not secure the building to the floor until
the roof has been fitted.
Position the panels so there is equal spacing
between the floor and cladding on all sides.
6x50mm Screws
50mm
screw
Pre drill
hole
2
5
a
a
a
IMPORTANT:
Pre-drill before fixing screws.
Summary of Contents for 01DTSHRAX1006SDFW-V1
Page 12: ...2 1 3 4...
Page 13: ...1 2...