P 4
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Please retain product label and instructions for future reference
Step 3
Parts needed - No. 3, (or 1, or 4 QTY 1)
No. 5 QTY 1
**Please note: The side panels are all
interchangeable and can be posititioned in
a variety of configurations. Decide which
works best before assembly. See Page 2 for
suggested options.**
Fix the corners of the 4th Plain Panel
(No. 5)
and a 2nd Plain Panel
(No. 3)
(or panel of your
choice) with 50mm screws as shown in diagram.
Do not secure the building to the floor until the
roof has been fitted,
Position the panels so there is equal spacing
between the floor and cladding on all sides.
3x50mm Screws
50mm
screw
Pre drill
hole
5
3
Step 4
Parts needed - No. 3, (or 1, or 4 QTY 1)
No. 4, (or 1, or 3 QTY 1)
Fix the corners of the 3rd Plain Panel
(No. 4)
and a 2nd Plain Panel
(No. 3)
(or panel of your
choice) with 50mm screws as shown in
diagram.
Fix the end of the 3rd Plain Panel
(No. 4)
(or panel of your choice) to the already standing
chosen panel with 50mm screws as shown in
diagram.
Do not secure the building to the floor until the
roof has been fitted,
Position the panels so there is equal spacing
between the floor and cladding on all sides.
6x50mm Screws
50mm
screw
Pre drill
hole
3
4
Step 5
Parts needed - No. 2 QTY 1
No. 4, (or 1 QTY 1)
Fix the end of the 3rd Plain Panel
(No. 4)
(or
panel of your choice) to the already standing
chosen panel with 50mm screws as shown in
diagram.
Fix the corners of the
1st Plain Panel
(No. 2)
to either side of the front of the building
depending on preference with 50mm screws as
shown in the diagram.
Do not secure the building to the floor until
the roof has been fitted,
Position the panels so there is equal spacing
between the floor and cladding on all sides.
6x50mm Screws
50mm
screw
Pre drill
hole
4
2
Step 2
Parts needed - No. 8 QTY 1
Place the floor panels
(No. 8)
onto a firm
and level base. Ensure the base has suitable
drainage, free from areas where standing
water can collect. See front page for base
requirements.
8