background image

P 3

Please retain product label and instructions for future reference

             

Nail Bag

There may be extra screws present in the nail bag 

50mm Screw x 50

20mm Screw x 8

40mm Screw x 34

30mm Screw x 64

60mm Screw x 10

Felt Tacks x 66

Remove transportation 

blocks from the bottom of 

each panel before beginning 

assembly. Each Panel should 

have two blocks.

Pre Assembly 

Step 1

Parts needed - No. 1  QTY 1

                                 No. 6  QTY 1

                                 No. 17 QTY 3

Place the door 

(No. 6)

 within the 

Door Panel 

(No. 1)

.  Fix the T Hinges

(No. 17)

 onto the door

 

and Door 

Panel as shown 

(taking into account

on which side of the Door Panel

opening you want the Door to open)

.  

Ensure that the screws go through the 

cladding and into the framing behind.

21x30mm Screws

17

Pre drill 

hole

30mm 

screw

1

6

Opens from the Left

Opens from the Right

**PLEASE NOTE**

  Before fitting the 

hinges, ensure the door is in the correct

position depending on which side you

want the door to open.  See external 

illustrations below which show the doors

internal framing. 

Summary of Contents for 01DTSHRAX0705SDNW-V1

Page 1: ...l be access to all sides for maintenance work and annual treatment Ensure the base is level and is built on firm ground to prevent distortion Refer to diagrams for the base dimensions The base should...

Page 2: ...ou 9 11 14 Fascia 12x60x847mm x4 S1260 847mm Inner Door Block 28x28x150mm FS2828 150mm Cover Trims 12x40x1792mm x7 S1240 1792mm Ridge Bar 28x28x2010mm FS2828 2010mm Finial Qty 2 Diamond Shed Finial Do...

Page 3: ...1 No 6 QTY 1 No 17 QTY 3 Place the door No 6 within the Door Panel No 1 Fix the T Hinges No 17 onto the door and Door Panel as shown taking into account on which side of the Door Panel opening you wan...

Page 4: ...el No 4 or panel of your choice to the already standing chosen panel with 50mm screws as shown in diagram Do not secure the building to the floor until the roof has been fitted Position the panels so...

Page 5: ...anel No 1 or panel of your choice to the already standing chosen panel and 1st Plain Panel No 2 with 50mm screws as shown in diagram Do not secure the building to the floor until the roof has been fit...

Page 6: ...below using 5x60mm screws per roof panel It is essential that the ridge bar No 14 and roof panel No 9 framing pull together when fixed with 60mm screws You may require another person pushing the ridg...

Page 7: ...13 Parts needed No 13 QTY 7 Fit the Cover Trims No 13 over each panel join and corner of the building as shown in the illustration using 30mm screws Pre drill to avoid splitting 21x30mm Screws 30mm sc...

Page 8: ...blocks using 30mm screws 2x30mm Screws Step 15 Parts needed No 10 QTY 1 No 12 QTY 2 30mm screw 30mm screw Pre drill hole Pre drill hole 12 12 a b a b 10 Step 16 Parts needed No 19 QTY 1 Screw the Pad...

Page 9: ...abel and instructions for future reference It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and...

Page 10: ...2 1 3 4...

Page 11: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...

Reviews: