background image

P 15

Please retain product label and instructions for future reference

             

Step 24

To fix the Hasl and Staple Lock 

(No. 23)

 in place. Screw the Staple

 

to the left

hand door.

Making sure the Hasp is in line with 

the staple and screw into the right hand

Door 

To lock the Door, place the Hasp  over the 

Staple and twist into the lock position as 

shown.  

8x30mm screws. 

Pre drill 

hole

30mm 

screw

23

23

This step is only for the 20x10 

building.

Fix the Pad Bolt 

(No. 39) 

to the 

side door with 6x30mm screws  

along the  horizontal door brace. 

Then fix the tower bolt retainer 

to the vertical door panel 

framing using 4x30mm screws.

10x30mm screws

39

Step 25

Step 26

Fix the Casement Stay 

(No. 33)

 

to the opening window then 

align the fixings onto the 

window panel frame. 

Ensure the casement stay fits 

into fixings when closed before 

screwing them down using 6 x 

20mm screws per casement 

stay.

10x10 - 12 x 30mm screws

12x10 - 12 x 30mm screws

14x10 - 12 x 30mm screws

15x10 - 18 x 30mm screws

16x10 - 12 x 30mm screws

18x10 - 12 x 30mm screws

20x10 - 18 x 30mm screws

33

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

AFTER TREATMENT:

score around protective

 cover on glazing and

 carefuly peel

 covering back

Summary of Contents for 01DTSHPWOR1010DDOW-V4

Page 1: ...utdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent the timber from deteriorating and to waterproof it This is required to maintain the anti rot guarantee Dip Treated buildings Require a preservative tre...

Page 2: ...h 4274mm Height 2504mm Pack Requirement 01DTSHPWOR1010DDOW V4 QTY 1 01DTSHPWORPB V1 QTY 2 Base Dimensions Width 3064mm Depth 4168mm 15X10 Apex Overall Dimensions Width 3229mm Depth 4572mm Height 2504mm Pack Requirement 01DTSHPWOR1010DDOW V4 QTY 1 01DTSHPWORPC V1 QTY 1 Base Dimensions Width 3064mm Depth 4466mm 16X10 Apex Overall Dimensions Width 3229mm Depth 4870mm Height 2504mm Pack Requirement 01...

Page 3: ...ight 2504mm Pack Requirement 01DTSHPWOR1010DDOW V4 QTY 1 01DTSHPWORPB V1 QTY 2 Base Dimensions Width 3064mm Depth 4168mm 15X10 Reverse Apex Overall Dimensions Width 3229mm Depth 4572mm Height 2504mm Pack Requirement 01DTSHPWOR1010DDOW V4 QTY 1 01DTSHPWORPC V1 QTY 1 Base Dimensions Width 3064mm Depth 4466mm 16X10 Reverse Apex Overall Dimensions Width 3229mm Depth 4870mm Height 2504mm Pack Requireme...

Page 4: ...MB12 P 503 Door Cloaking Strip 27x44x1658mm Qty 1 F2744 G 1658 Door Strip 12x30x1600mm Qty 2 S1230 1600 11 12 13 14 30 15 16 17 Truss Support AI 01WORTS1651X88 Qty 2 Cover Strip 12x56x1850mm Qty 6 S1256 1850 Fascia Spacing Block 28x28x150mm Qty 4 F2828 150 Hasp and Staple Lock PI 07 0191 Butt Hinge Qty 4 PI 07 0066 Tower Bolt Qty 2 PI 07 0030 Window Strip 12x56x1038mm Qty 2 S1256 1038 Cover Strip ...

Page 5: ... 15 Truss Supportt AI 01WORTS1651X88 Qty 2 Cover Strip 12x56x1850mm Qty 2 S1256 1850 Window Strip 12x56x1038mm Qty 1 S1256 1038 18 32 U Channel Qty 2 PI 07 0031 Casement stay Qty 1 PI 07 0007 Butt Hinge Qty 2 PI 07 0066 24 33 5ft Floor Panel AI 01TAGFLOOR1532X1490 Qty 2 37 2 Plain Side Panel AI 01SHPWORPS1490X1784 Qty 1 5ft Roof Panel AI 01TAGROOF1490X1760 Qty 2 38 9 Door AI 01 217ZB600X1720 Qty 2...

Page 6: ...ill hole 6 5 Step 2 7 x 50mm screws Repeat the previous step when adding the second Small Plain Panel No 6 ensure they are level at the top and bottom then fix together using 7x50mm screws Stagger the screws so they do not collide 50mm screw Pre drill hole 6 5 6 Step 3 Place the Left Gable and Right Gable No 3 4 together and make sure that they meet level Fix together in the middle using 50mm scre...

Page 7: ...w Pre drill hole 6 5 6 4 3 Plain Gable Assembly Step 5 7 x 50mm screws Lay two of the plain side panels No 2 on a level floor place them next to each other ensure they are level at the top and bottom then fix together using 7x50mm screws Stagger the screws so they do not collide 2 50mm screw Pre drill hole 2 Place the other set of assembled Gables No 3 4 above the plain panels Make sure that the G...

Page 8: ...s so they do not collide 40mm screw Pre drill hole 16x10 Floor 20x10 Floor 12x10 Floor 10x10 Floor 7 7 7 7 7 7 7 7 35 35 35 35 37 37 37 37 35 35 35 35 NOT ALL SIZE OPTIONS ARE SHOWN BELOW THE ILLUSTRATIONS ARE EXAMPLES Fix the corners of the assembled plain gable and a plain side panel No 2 with 50mm screws as shown in diagram Do not secure the building to the floor until the roof is fitted Positi...

Page 9: ... 15x10 12x50mm Screws 16x10 24 x 50mm Screws 18x10 30 x 50mm Screws 20x10 18 x 50mm Screws 50mm screw Pre drill hole 2 10X10 20X10 12X10 16X10 1 2 1 2 2 1 2 34 34 1 2 34 34 39 34 34 34 34 NOT ALL SIZE OPTIONS ARE SHOWN BELOW THE ILLUSTRATIONS ARE EXAMPLES Step 11 Fix the Door Gable refer to steps 1 2 and 3 if you have not already assembled this at the corners with 50mm screws as shown in diagram 6...

Page 10: ...0mm Screws 18x10 40 x 30mm Screws 20 x 40mm crews 20x10 24 x 30mm Screws 16 x 40mm Screws NOT ALL SIZE OPTIONS ARE SHOWN BELOW THE ILLUS TRATIONS ARE EXAMPLES 10x10 4 x 70mm Screws 2 x 100mm Screws 12x10 8 x 70mm Screws 4 x 100mm Screws 14x10 12 x 70mm Screws 6 x 100mm Screws 15x10 14 x 70mm Screws 8 x 100mm Screws 16x10 16 x 70mm Screws 8 x100mm Screws 18x10 18 x 70mm Screws 10 x 100mm Screws 20x...

Page 11: ...p 16 Following the same method used in the previ ous step secure the roof panels No 8 36 38 together using the metal U channel No 32 and 6x40mm screws per U channel For a 10x10 you will have one U channel two for the 12x10 15x10 three for the 14x10 20x10 four for the 16x10 and five for the 18x10 32 10X10 Place the roof panels No 8 36 38 ontop of the building and truss making sure the roof panels s...

Page 12: ...NOT ALL SIZE OPTIONS ARE SHOWN BELOW THE ILLUSTRATIONS ARE EXAMPLES 1 3 4 2 Step 18 HANDLE WITH CARE 1 2 3 4 10x10 170 x felt tacks 12x10 190 x felt tacks 14x10 225 x felt tacks 15x10 240 x felt tacks 16x10 260 x felt tacks 18x10 285 x felt tacks 20x10 310 x felt tacks Cut four strips of felt No 29 and place onto the roof See below for sizes Place the felt flat onto the roof in the order that is s...

Page 13: ...5 15 15 15 15 15 15 15 19 15 15 15 15 19 15 15 15 15 15 15 19 15 15 19 19 19 15 15 19 19 15 15 15 15 15 15 19 NOT ALL SIZE OPTIONS ARE SHOWN BELOW THE ILLUS TRATIONS ARE EXAMPLES Step 20 8 x 30mm screws 16 x 40mm Screws Attach the Fascia Spacing lock No 21 to the front and back of the roof using 2x30mm screws per block Ensure the blocks are flush to the edge of the roof Fit the Fascias No 22 and F...

Page 14: ...m screws 18x10 6 x 30mm screws 20x10 12 x 30mm screws 30mm screw Pre drill hole 16 16 Step 23 18 10 30mm 16mm Opening Window Fixed Window 30mm screw 30mm screw 16mm screw 30mm screw 24 Place the Window Strip No 18 11mm above the window gap in the window panel and fix with 3x30mm screws per strip If you would like the windows to be opening use the Butt Hinges No 24 to attach to the window strip and...

Page 15: ...l door brace Then fix the tower bolt retainer to the vertical door panel framing using 4x30mm screws 10x30mm screws 39 Step 25 Step 26 Fix the Casement Stay No 33 to the opening window then align the fixings onto the window panel frame Ensure the casement stay fits into fixings when closed before screwing them down using 6 x 20mm screws per casement stay 10x10 12 x 30mm screws 12x10 12 x 30mm scre...

Page 16: ...e drill hole 6 2 Step 2 7 x 50mm screws Repeat the previous step when adding the second Small Plain Panel No 6 ensure they are level at the top and bottom then fix together using 7x50mm screws Stagger the screws so they do not collide 50mm screw Pre drill hole 6 2 6 Step 3 Place the Left Gable and Right Gable No 3 4 together and make sure that they meet level Fix together in the middle using 50mm ...

Page 17: ...y Step 5 7 x 50mm screws Lay one of the Plain Side Panel No 2 and a Window Side Panel No 1 on a level floor place them next to each other ensure they are level at the top and bottom then fix together using 7x50mm screws Stagger the screws so they do not collide 1 50mm screw Pre drill hole 2 Place the other set of assembled Gables No 3 4 above the plain panels Make sure that the Gables meet exactly...

Page 18: ...x 40mm screws 12x10 16 x 40mm screws 14x10 24 x 40mm screws 15x10 16 x 40mm screws 16x10 32 x 40mm screws 18x10 10x 40mm screws 20x10 24 x 40mm screws NOT ALL SIZE OPTIONS ARE SHOWN BELOW THE ILLUSTRATIONS ARE EXAMPLES Fix the corners of the assembled plain gable and a plain side panel No 2 with 50mm screws as shown in diagram Do not secure the building to the floor until the roof is fitted Positi...

Page 19: ... drill hole 2 10X10 20X10 12X10 16X10 1 2 1 2 2 5 2 34 34 5 2 34 34 39 34 34 34 34 10x10 6 x 50mm Screws 12x10 12 x 50mm Screws 14x10 18 x 50mm Screws 15x10 12x50mm Screws 16x10 24 x 50mm Screws 18x10 30 x 50mm Screws 20x10 18 x 50mm Screws NOT ALL SIZE OPTIONS ARE SHOWN BELOW THE ILLUSTRATIONS ARE EXAMPLES Step 11 Fix the Window Gable refer to steps 1 2 and 3 if you have not already assembled thi...

Page 20: ...0mm Screws 18x10 40 x 30mm Screws 20 x 40mm crews 20x10 24 x 30mm Screws 16 x 40mm Screws NOT ALL SIZE OPTIONS ARE SHOWN BELOW THE ILLUS TRATIONS ARE EXAMPLES 70mm screw 100mm screw Pre drill hole 13 13 Step 14 Place an assembled Truss central to where two panels join Align the top of the truss one inch 25mm below the top of the sides as shown in the diagram HINT Use a piece from the fixing kit as...

Page 21: ...p 16 32 10X10 Place the roof panels No 8 36 38 ontop of the building and truss making sure the roof panels sit into the gables and truss Place two roof panels for the 10x10 building three for the 12x10 and 15x10 four for the 14x10 and 20x10 five for the 16x10 and six for the 18x10 Ensure there is an eqal amount of roof overhang on either side of the building Secure all the roof panels to the build...

Page 22: ...NOT ALL SIZE OPTIONS ARE SHOWN BELOW THE ILLUSTRATIONS ARE EXAMPLES 1 3 4 2 Step 18 HANDLE WITH CARE 1 2 3 4 Cut four strips of felt No 29 and place onto the roof See below for sizes Place the felt flat onto the roof in the order that is stated on the diagram below Once the sheets are laid out fix them onto the roof with tacks 100mm apart 1 2 3 4 10x10 170 x felt tacks 12x10 190 x felt tacks 14x10...

Page 23: ...15 15 15 15 19 15 15 19 19 19 15 15 19 19 15 15 15 15 15 15 19 19 19 19 19 NOT ALL SIZE OPTIONS ARE SHOWN BELOW THE ILLUSTRATIONS ARE EXAMPLES Step 20 8 x 30mm screws 16 x 40mm Screws Attach the Fascia Spacing lock No 21 to the front and back of the roof using 2x30mm screws per block Ensure the blocks are flush to the edge of the roof Fit the Fascias No 22 and Finials No 30 to the roof over the fe...

Page 24: ...10 6 x 30mm screws 16x10 6 x 30mm screws 18x10 6 x 30mm screws 20x10 12 x 30mm screws Step 23 18 10 30mm 16mm Opening Window Fixed Window 30mm screw 30mm screw 16mm screw 30mm screw 24 Place the Window Strip No 18 11mm above the window gap in the window panel and fix with 3x30mm screws per strip If you would like the windows to be opening use the Butt Hinges No 24 to attach to the window strip and...

Page 25: ...l door brace Then fix the tower bolt retainer to the vertical door panel framing using 4x30mm screws 10x30mm screws 39 Step 25 Step 26 Fix the Casement Stay No 33 to the opening window then align the fixings onto the window panel frame Ensure the casement stay fits into fixings when closed before screwing them down using 6 x 20mm screws per casement stay 10x10 12 x 30mm screws 12x10 12 x 30mm scre...

Page 26: ... 2 1 3 4 ...

Page 27: ... 1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE ...

Reviews: