background image

P 7

Please retain product label and instructions for future reference

             

Step 12

Parts needed - No. 19 QTY 2

Place Truss Block  

(No. 19) 

up to the Roof Truss 

(No.18)  

so the angled cut edge is facing 

upwards, flush to the Roof Truss 

(No. 18). 

Fix 

in place with 2x50mm screws through the 

block into the panel framing. 

Repeat on the opposite side of the building. 

4x50mm Screws

30mm 

screw

Pre drill 

hole

19

20

Step 13

Parts needed - No. 20 QTY 1

   

 

Place the Truss Brace 

(No.20) 

underneath the two Roof Support 

Bars 

(No.18) 

ensuring they sit flush 

to one another. The Truss Brace 

(No.20) 

should sit horizontal - 

parallel to the floor. 

Once in position fix the Truss Brace 

(No.20)  

in place with 2x40mm 

screws at each end of the brace.

4x40mm Screws

40mm 

screw

Pre drill 

hole

9

9

Pre drill 

hole

40mm 

screw

Step 14

Use 40mm screws to fix The Roofs 

(No. 9)

 down 

the sides and at the bottom being sure that the 

screws attach into the framing below.

20x40mm Screws

9

9

50mm 

screw

Pre drill 

hole

Step 15

Once the roof is fixed, attach the building to the 

floor with 50mm screws.

Ensure the screws go through the panel into 

the floor framing

21x50mm Screws

Summary of Contents for 01DTSHOSBRAX0806SDFW-V1

Page 1: ...ll be access to all sides for maintenance work and annual treatment Ensure the base is level and is built on firm ground to prevent distortion Refer to diagrams for the base dimensions The base should...

Page 2: ...S1240 1792mm Ridge Bar 27x70x1152mm QTY 2 F2770 1152mm Finial QTY 2 Diamond Shed Finial Door Panel AI 01S11SHSD1180X1802 V1 Gable Top QTY 2 AI S11SHAGT1704X391 V1 Floor QTY 2 AI R11OSBF1175X1753 V1 R...

Page 3: ...ens from the Left Opens from the Right Step 1 Parts needed No 1 QTY 1 No 6 QTY 1 No 24 QTY 3 Place the door No 6 within the Door Panel No 1 Fix the T Hinges No 24 onto the door and Door Panel as shown...

Page 4: ...cladding on all sides 3x50mm Screws 50mm screw Pre drill hole 2 4 Step 4 Parts needed No 2 or 1 or 4 QTY 1 No 4 or 1 or 2 QTY 1 Fix the corners of the Large Plain Side No 5 and a Window Panel No 2 or...

Page 5: ...re is equal spacing between the floor and cladding on all sides 6x50mm Screws 30mm screw Pre drill hole Step 8 Parts needed No 17 QTY 2 No 25 QTY 2 No 28 QTY 1 Connect two Ridge Bars No 17 together wi...

Page 6: ...o 9 framing pull together when fixed with 60mm screws You may require another person pushing the ridge bar No 17 up from below to achieve this HINT Follow the nailing line of the framing on the roof p...

Page 7: ...erneath the two Roof Support Bars No 18 ensuring they sit flush to one another The Truss Brace No 20 should sit horizontal parallel to the floor Once in position fix the Truss Brace No 20 in place wit...

Page 8: ...No 21 For added weather protection fit your windows using silicone sealant around the outside edges When positioning the styrene sheets ensure there is an equal distance on all sides Attach 1x Outer W...

Page 9: ...h 40mm screws as shown Pre drill to avoid splitting Followed by adding the Finials No 23 over the Fascias using x2 40mm screws per Finial 16x40mm Screws 23 Step 20 Parts needed No 10 QTY 1 No 15 QTY 2...

Page 10: ...rew 27 Step 21 Parts needed No 27 QTY 1 Screw the Pad Bolt No 27 on to the door No 1 and the retainer to the door panel No 6 using 10x30mm screws Make sure that you screw into the framing behind 10x30...

Page 11: ...2 1 3 4...

Page 12: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...

Reviews: