P 3
Please retain product label and instructions for future reference
Pre Assembly
Before assembling remove the transportation
blocks from the bottom of each panel.
Take care removing the blocks as to not damage
the panels. Tap with a flat headed screwdriver
and hammer.
Dispose of the blocks once removed.
Pre drill
hole
IMPORTANT:
Pre-drill before fixing screws.
1
4
18
30mm
screw
Pre drill
hole
Step 1
Parts needed - No. 1 QTY 1
- No. 4 QTY 1
- No. 18 QTY 3
Fix the T-Hinge
(No.18)
onto the door
(No.4),
and the Door Gable
(No.1).
Ensure that the screws go through
the cladding and into the framing
behind.
21x30mm Tamper Proof Screws
IMPORTANT:
Pre-drill before fixing screws.
Step 2
Parts needed - No. 6 QTY 2
Place the floor panels
(No.6)
onto a firm
and level base. Ensure the base has suitable
drainage, free from areas where standing
water can collect.
Secure the floors together using 8x50mm
screws through the floor bearers in an
alternating pattern.
8x50mm Screws
6
50mm
screw
6
3
2
Step 3
Parts needed - No. 2 QTY 1
- No. 3 QTY 1
Place the Plain Gable
(No.2)
and the
window side
(No.3)
onto the floor
(No.6)
and fix together with 3x50mm
screws
Do not secure the builidng to the floor
until the roof has been fitted.
3x50mm Screws
50mm
screw
Pre drill
hole
IMPORTANT:
Pre-drill before fixing screws.
a
a
a
a
Summary of Contents for 01DTSHAX0806SDSEC-V1
Page 8: ...2 1 3 4...
Page 9: ...1 2...