background image

Please retain product label and instructions for future reference

             

12

12

12

12

Pre drill 

hole

30mm           

screw

Step 16

Fix the cover trims 

(No. 12)

 around 

the building (

as shown in the 

illustration

) securing each trim

into place using 3x30mm 

screws.

12x30mm Screws

19

18

19

18

18

19

18

19

Step 17

Attach the fascia boards 

(No. 18 

& No. 19)

 to the front and rear 

of the building using 3x40mm

screws per fascia.

*Ensure to screw through

the boards into the 

framing.

24x40mm Screws

Pre drill 

hole

40mm           

screw

Pre drill 

hole

20mm           

screw

Step 18

Fix the barge boards 

(No. 16 

& No. 17)

 to the front of the 

building using 3x20mm screws 

per board.

9x20mm Screws

17

17

16

30mm           

screw

Pre drill 

hole

19

Step 19

Place the Cloaking Strip 

(No. 20)

 to 

the rear of one of the doors. Fixing in 

position screwing through the door  

into the cloaking strip with 3x30mm

screws.

Align the tower bolts onto the

vertical framing of the secondary

door, secure the bolts to the

top and bottom using 6x30mm

screws per tower bolt.

Mark the position of the bolt

& drill a hole above and below

for the bolt to catch in to.

15x30mm Screws

23

20

Summary of Contents for 01DTGRODB1008-V4

Page 1: ...treated as soon as possible and annually to prevent the timber from deteriorating and to waterproof it This is required to maintain the anti rot guarantee Dip Treated buildings Require a preservative...

Page 2: ...ransportation blocks from the bottom of each panel before beginning assembly Each Panel should have two blocks 20mm Screw x22 PI 07 0191 P 2 01DTGRODB1008 V4 Overall Dimensions Length 3055mm Width 259...

Page 3: ...No 11 up to the assembled gable ensuring the bottom of the strip lines up with the underneath of the door panel framing as shown in the illustration and fix in place using 40mm screws 6x40mm Screws P...

Page 4: ...d fix in place using 40mm screws 6x40mm Screws Pre drill hole 40mm screw a a Pre drill hole Pre drill hole Step 7 Place the window strip 13mm No 16 above the gap in the window panel and fix into place...

Page 5: ...and first plain side onto the floor No 7 and fix in place Fix the corners with 50mm screws Do not secure the building to the floor until the roof is fixed 3x50mm Screws a b Pre drill hole 50mm screw...

Page 6: ...raming sits into the cut out sections and rest on the framing Fix each sml roof section to the gable using 7x30mm screws per roof panel 14x30mm Screws Pre drill hole 30mm screw Rafter Roof panel 9 9 5...

Page 7: ...aming 24x40mm Screws Pre drill hole 40mm screw Pre drill hole 20mm screw Step 18 Fix the barge boards No 16 No 17 to the front of the building using 3x20mm screws per board 9x20mm Screws 17 17 16 30mm...

Page 8: ...drill hole 30mm screw 21 Pre drill hole 20mm screw Step 21 Fix the casement stay No 26 to the window then align the fixings to the window panel Ensure the casement stay fits onto the fixings before s...

Page 9: ...el and instructions for future reference It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and ca...

Page 10: ...2 1 3 4...

Page 11: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...

Reviews: