background image

P 5

Please retain product label and instructions for future reference

             

Pre drill 

hole

50mm           

screw

Step 8

Place floors 

(No. 7)

 on a firm and level base, 

ensure base has suitable drainage  free from 

areas where standing water can collect.  (

see 

front page on base requirements

).  

Ensure floors are flush to each other and fix 

using 8x50mm screws. Alternate fixing 

positions along the length of the floors.

*NOTE: The floors do NOT connect by a

tongue and groove fixing.

8x50mm Screws

7

7

3

b

b

b

b

b

b

Pre drill 

hole

50mm           

screw

a

a

a

Step 9

Place the assembled plain gable 

(No. 3)

and first plain side onto the floor 

(No. 7)

 

and fix in place.

 

Fix the corners with 50mm

 screws.

 

Do not secure the building

 

to the floor until the roof is

 fixed.

3x50mm Screws

a

b

Pre drill 

hole

50mm           

screw

3

2

a

a

a

a

b

b

b

b

a

a

Step 10

Following the same method outlined

in step 9, attach the next plain side 

(No. 3)

 & the window side 

(No. 2)

 on to 

the assembly.

 

Fix the panels with 50mm

 screws.

 

Do not secure the building

 

to the floor until the roof is

 fixed.

6x50mm Screws

a

b

2

a

a

a

b

b

a

a

a

a

a

a

b

b

b

Pre drill 

hole

50mm           

screw

Step 11

Following the same method outlined

in step 9, attach the door gable & the 

remaining window side 

(No. 2)

 on to the 

assembly.

 

Fix the panels with 50mm

 screws.

 

Do not secure the building

 

to the floor until the roof is

 fixed.

9x50mm Screws

a

b

Summary of Contents for 01DTGRODB1008-V4

Page 1: ...treated as soon as possible and annually to prevent the timber from deteriorating and to waterproof it This is required to maintain the anti rot guarantee Dip Treated buildings Require a preservative...

Page 2: ...ransportation blocks from the bottom of each panel before beginning assembly Each Panel should have two blocks 20mm Screw x22 PI 07 0191 P 2 01DTGRODB1008 V4 Overall Dimensions Length 3055mm Width 259...

Page 3: ...No 11 up to the assembled gable ensuring the bottom of the strip lines up with the underneath of the door panel framing as shown in the illustration and fix in place using 40mm screws 6x40mm Screws P...

Page 4: ...d fix in place using 40mm screws 6x40mm Screws Pre drill hole 40mm screw a a Pre drill hole Pre drill hole Step 7 Place the window strip 13mm No 16 above the gap in the window panel and fix into place...

Page 5: ...and first plain side onto the floor No 7 and fix in place Fix the corners with 50mm screws Do not secure the building to the floor until the roof is fixed 3x50mm Screws a b Pre drill hole 50mm screw...

Page 6: ...raming sits into the cut out sections and rest on the framing Fix each sml roof section to the gable using 7x30mm screws per roof panel 14x30mm Screws Pre drill hole 30mm screw Rafter Roof panel 9 9 5...

Page 7: ...aming 24x40mm Screws Pre drill hole 40mm screw Pre drill hole 20mm screw Step 18 Fix the barge boards No 16 No 17 to the front of the building using 3x20mm screws per board 9x20mm Screws 17 17 16 30mm...

Page 8: ...drill hole 30mm screw 21 Pre drill hole 20mm screw Step 21 Fix the casement stay No 26 to the window then align the fixings to the window panel Ensure the casement stay fits onto the fixings before s...

Page 9: ...el and instructions for future reference It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and ca...

Page 10: ...2 1 3 4...

Page 11: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...

Reviews: