background image

P 7

Please retain product label and instructions for future reference

             

50mm 

Overhang

Step 14

Cut felt into 4 sheets at 2522mm and 

lay onto roof as shown in diagram 

ensuring there is a 50mm overhang 

around the sides. 

Fix using felt tacks at 100mm intervals

140x felt tacks

27

13

13

Step 15

Use 3x30mm screws to fix each cover 

trim.

12x30mm screws

Pre drill 

hole

30mm           

screw

20

19

Step 16

Fit fascia boards to the front and the 

back of building using 3x40mm screws 

per board as shown in diagram. 

Pre drill holes beforehand making sure 

screws go into the framing.

24x 40mm screws

Pre drill 

hole

40mm           

screw

18

17

Step 17

Fit the barge boards to the front of the 

building using 3x20mm screws per board

as shown in the diagram.

9x20mm screws

Pre drill 

hole

20mm           

screw

Summary of Contents for 01DTGRODB0808-V3

Page 1: ...water during extended periods of warm sunshine and sheltered as much as possible during rain or snow Once your garden building has been installed it will need to be treated as soon as possible and an...

Page 2: ...45 x 1449mm QTY 1 S1245 1449MM Barge Board 12 x 95 x 691mm QTY 1 S1295 G 691MM Barge Board 12 x 95 x 760mm QTY 2 S1295 G 760MM Fascia Board 12 x 95 x 835mm QTY 4 S1295 G 835MM Fascia Board 12 x 95 x 7...

Page 3: ...or future reference Step 1 Lay the Door Panel and Gable Top on a level floor place the gable top on top of the door panel ensure they are level at the top then fix together using 60mm screws Stagger t...

Page 4: ...ds to ensure rigidity 42x30mm screws 30mm screw Pre drill hole 3 4 Step 5 Lay the plain back panel and the remaining gable top on a level floor place the gable top on top of the plain back panel ensur...

Page 5: ...g 4x30mm screws Ensure to screw through the window into the panel framing 4x30mm Screws b a 10 Opening Window Fixed Window 30mm screw 30mm screw 16mm screw 30mm screw 22 16 Pre drill hole a b Pre dril...

Page 6: ...ng fits into slot at top between the gable top rafters Fix panels into position using 4x30mm screws from the top of panel straight into the rafter Pre drill holes before hand Ensure the larger over ha...

Page 7: ...3 Step 15 Use 3x30mm screws to fix each cover trim 12x30mm screws Pre drill hole 30mm screw 20 19 Step 16 Fit fascia boards to the front and the back of building using 3x40mm screws per board as shown...

Page 8: ...aple to the Door Gable or secondary door Making sure the Hasp is in line with the staple and screw into the Door or Master door To lock the Door place the Hasp over the Staple and twist into the lock...

Page 9: ...el and instructions for future reference It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and ca...

Page 10: ...2 1 3 4...

Page 11: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...

Reviews: