Mercia Garden Products 01DDPENT1008-V3 General Instructions Manual Download Page 5

P 5

Please retain product label and instructions for future reference

             

8

13

13

Step 8

Attach the 2x eaves frames (

No. 13

)

to each roof (

No. 8

) using 3x30mm 

screws per eaves frame.

*Ensure the eaves are flush to the 
edges of the roof sheet.

*

For T&G roof options use the same

method as stated above ensuring the
eaves framing is flush with the edge
of the roof framing and screwed directly
through the eaves framing into the
roof framing and not into the T&G
boards.

12x40mm Screws

Pre drill 

hole

30mm 

screw

13

13

8

* OSB OPTION

* T&G OPTION

Step 9

Place the assembled roof panels
on to the building and secure as
shown in the illustration with
18x30mm screws

* Ensure the roofs are flush with
the sides of the building.

18x30mm Screws

Pre drill 

hole

30mm 

screw

*If you have purchased the T&G roof and floor option ensure to fix 
the roof to the building using 38x70mm screws following the same 
method outlined above.

Internally

:  Secure the roof panels together where they join using 

5x50mm screws.

18x70mm Screws
5x50mm Screws

Pre drill 

hole

70mm 

screw

50mm 

screw

b

b

b

b

b

b

b

Step 10    

 

Secure the building to the

 

floor using 18x50mm screws.

*Ensure to screw through the framing
into the floor bearers.

18x50mm Screws

Pre drill 

hole

50mm 

screw

b

b

b

b

Step 11

Cut the felt into 3 sheets and lay
onto the roof.

* Ensure there is approximately 
50mm of overhang around the
building.

Fix into place using 219x felt tacks
at 100mm intervals.

219xFelt Tacks

Felt 

tacks 

Felt size: 10x8 - 3220mm
 

    12x8 - 3760mm

 

   

1.

2.

3.

HANDLE

WITH CARE

1

2

3

4

Summary of Contents for 01DDPENT1008-V3

Page 1: ...eriorating and to waterproof it This is required to maintain the anti rot guarantee Dip Treated buildings Require a preservative treatment to protect against rot and decay and a waterproof treat ment...

Page 2: ...t 27x44x2238mm QTY 3 F2744 2238 PT3 Eaves Frame QTY 4 10x8 28x28x1546mm FS2828 1546 PT3 12x8 28x28x1819mm FS2828 1819 PT3 T Hinge QTY 6 PI 07 0021 Turn Button QTY 1 PI 07 0034 Pad Bolt QTY 1 PI 07 003...

Page 3: ...tch to the opposite door with 10x30mm screws Measure between the top and bottom of the door to the pad bolt and cut 2x No 9 strips to t secure in place with 2x20mm screws per strip 52x30mm Screws 4x20...

Page 4: ...w the method outlined in step 4 Place the remaining gable and window panel onto the oor and x using 9x50mm screws 9x50mm Screws 5 2 a a a a a a Pre drill hole 50mm screw Step 7 If you have purchased t...

Page 5: ...nsure the roofs are ush with the sides of the building 18x30mm Screws Pre drill hole 30mm screw If you have purchased the T G roof and oor option ensure to x the roof to the building using 38x70mm scr...

Page 6: ...n to t Pre drill hole 30mm screw 9 9 9 9 9 9 Step 13 Measure the gaps at the corners of the building cut 6x No 9 strips to match Once cut secure to the building using 3x30mm screws per strip 18x30mm S...

Page 7: ...abel and instructions for future reference It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and...

Reviews: