background image

P 3

Please retain product label and instructions for future reference

             

Pre Assembly

Before assembling remove the transportation
blocks from the bottom of each panel.

6

6

Step 1

Place the floor (

No. 6

) onto a firm and level

base upside down, ensuring the base
has suitable drainage & is free from
areas where standing water can collect.

Secure the floors together using 6x50mm
screws, fixing in an alternating pattern 
as shown in the illustration.

Once fitted, turn the floor assembly the
right way up.

6x50mm Screws

Pre drill 

hole

50mm 

screw

9

14

16

Cut down to fit

a

b

c

Step 2: 

Door panel assembly

 

Locate the doors (

No. 7

) into the door panel 

 

and fix in place using 3x T-Hinges (

No. 14

), 

 

securing with 7x30mm screws.

 

Attach the pad bolt (

No. 16

) to the centre door

 

support and the catch to the opposite door with 

 

10x30mm screws.

 

Measure between the top and bottom of the 

 

door to the pad bolt and cut 2x (

No. 9

) strips 

 

to fit, secure in place with 2x20mm screws per 

 strip.

52x30mm Screws
4x20mm Screws

a

b

c

Pre drill 

hole

30mm 

screw

20mm 

screw

1

Pre drill 

hole

30mm 

screw

Step 3: 

Window panel assembly

 

Cut 7x (

No. 10) 

strips to 515mm and secure 4x

 

strips to the inside of the window gap

 

using 2x20mm screws per strip.

*Ensure the strips are flush with the framing.

 

Place the plastic cill (

No. 17) 

on top of the board

 

and rest the styrene (

No. 18) 

in the window gap.

 

Measure the window gap and cut 1x (

No. 10)

 

strip to fit, securing in place with 3x20mm

 

screws. Attach the remaining 3 (

No. 10)

 strips from

 part 

using 2x20mm screws per strip.

17x20mm Screws

Cut down to fit

Pre drill 

hole

30mm 

screw

a

b

c

 

*For added weather protection fit your
windows using silicone sealant around
the outside edges.

a

b

c

16

10

10

10

10

18

18

10

10

10

10

2

17

SILICONE

SEALANT

Summary of Contents for 01DDPENT1008-V3

Page 1: ...eriorating and to waterproof it This is required to maintain the anti rot guarantee Dip Treated buildings Require a preservative treatment to protect against rot and decay and a waterproof treat ment...

Page 2: ...t 27x44x2238mm QTY 3 F2744 2238 PT3 Eaves Frame QTY 4 10x8 28x28x1546mm FS2828 1546 PT3 12x8 28x28x1819mm FS2828 1819 PT3 T Hinge QTY 6 PI 07 0021 Turn Button QTY 1 PI 07 0034 Pad Bolt QTY 1 PI 07 003...

Page 3: ...tch to the opposite door with 10x30mm screws Measure between the top and bottom of the door to the pad bolt and cut 2x No 9 strips to t secure in place with 2x20mm screws per strip 52x30mm Screws 4x20...

Page 4: ...w the method outlined in step 4 Place the remaining gable and window panel onto the oor and x using 9x50mm screws 9x50mm Screws 5 2 a a a a a a Pre drill hole 50mm screw Step 7 If you have purchased t...

Page 5: ...nsure the roofs are ush with the sides of the building 18x30mm Screws Pre drill hole 30mm screw If you have purchased the T G roof and oor option ensure to x the roof to the building using 38x70mm scr...

Page 6: ...n to t Pre drill hole 30mm screw 9 9 9 9 9 9 Step 13 Measure the gaps at the corners of the building cut 6x No 9 strips to match Once cut secure to the building using 3x30mm screws per strip 18x30mm S...

Page 7: ...abel and instructions for future reference It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and...

Reviews: