Step 4 - Top Rail Assembly
Complete the main frame
by inserting
top rail (# 4)
on
top rail
(# 3) as shown in Figure 4.
Step 5 -
Securing the support leg to the top rail.
Secure one side of the support leg - Extension of vertical leg (# 6A) to the frame using the locking screw (#A),
washer small security (# B) and Allen key (# C) as shown in FIGURE 5. If the holes do not match, turn the
extension of the Vertical leg back and forth to align the holes. Repeat the same way for all the leg holders.
NOT
E
:
The holes on the other side of the support leg will be used later, when installing the cover net
- after all the
s
prings
(# 7) have been installed (steps 7 - 10).
Do not overtighten the screws in this mo
m
ent, screws should be tightened until the end
Tip: make sure that the holes in all the pieces of Steel Pipe Line and the hole is outwards. This is important for
the installation of the cover later.
# 6A
# 6B
# 5
# 4
# 6A
# 6B
# 3
# 3
# 6A
Turn the
Vertical
extension leg
to
align with the
drilling
Orifice
# B
# C
# A
FIGURE
4
FIGURE
5
9