- 29 -
Installation manual
M-WRG-II M/MB
Meltem Wärmerückgewinnung GmbH & Co. KG
Am Hartholz 4 · D-82239 Alling
[email protected] · www.meltem.com
VENTILATION THE RIGHT WAY
V E N T I L A T I O N & H E A T R E C O V E R Y
Fig. 27: Installation kit plastered on the inside
1
2
3
Fig. 28: Installation kit plastered on the outside
1
9.13
Cutting ventilation pipes to length
► Push the two ventilation pipes (item 1
in Fig. 29) into the openings in the
installation kit until they end flush with
the inside of the installation kit (item 2
► On the outer wall, mark the excess
length of the ventilation pipes to suit
the outer wall terminal, see Table 4.
Outer wall terminal
Excess
Stainless steel pod,
M-WRG-II ES
5 - 10 mm from the plastered external wall
Stainless steel pipe set,
M-WRG-ESR
25 - 30 mm from the plastered external wall
Table 4: Excess length of the ventilation pipes from the external wall
► Remove the ventilation pipes from the openings in the installation kit.
► Shorten the ventilation pipes to the marked length.
► Deburr the inner and outer ends of the ventilation pipes.
NOTICE
If you do not deburr the ventilation pipes there is a risk of damaging the seals at the
ventilation unit and outer wall terminal.
Fig. 29: Cutting ventilation pipes to length
1
2