Fig. 51:
Plastering trim and internal wall cladding ending flush
10
0
16
0
15
15
12
,5
15
31
7,
5
118
60
A- A
D
D
289 M-WRG-II M-U
2
(shortened)
The OSB board
(item 1) and plaster
-
board (item 2) extend
over the installation kit
(item 3).
In this version no
cutouts are needed in
the OSB board for the
flat ductwork.
Detail of version 1
1
2
3
9.6
Inserting the protective cover and plaster cover
► Insert the protective cover (item 1 in
Fig. 52) into the wall box (item 3 in
NOTICE
There is a risk that the wall box will be
deformed during the remainder of the
installation process if the protective
cover is not inserted. If this happens, it
will not be possible to insert the venti-
lation unit into the wall box.
► Insert the plaster cover (item 2 in
Fig. 52) into the wall box (item 3 in
Fig. 52) as far as it will go.
Fig. 52: Inserting the protective cover and plaster cover
1
2
3