BX 4000 Sereies Quick Start Guide
Mellanox Technologies
Rev 1
8
option recesses the gateway past the end of the rack. First catch all of the screws in the rail
slide and then tighten all of the screws together, to 3Nm or 26.5 pound inches.
Note: The rail slides are right and left handed. if you have the wrong rail slide the holes will not align
properly with the holes in the gateway.
3. Clip the caged nuts into the holes in the rack you will be using to connect the rails.
Figure 6: Clipping in the Caged Nuts
4. Using two of the pan head screws and one washer, for each rail, install the rails to the end of
the rack. Place the rail behind the holes in the rack and screw the screws through the holes into
the rails. Do not tighten the screws just yet.
Figure 7: Connecting the Rails
5. Place the bolts for the caged nuts in a convenient location, so as to be easily accessible when
you install the gateway into the rails.
Notch side up
This side of the gateway will
be even with the vertical rack
support. The other side of the
gateway will be deeper inside
of the rack than this side.
The caged nuts
are separated by a
single space
20