
SECTION 4 - OPERATING INSTRUCTIONS
Contents Page
SAFETY CHECKS - PRE-STARTING _________________________________________________________________1
INSPECTION PRIOR TO OPERATION ________________________________________________________________2
OPERATION _____________________________________________________________________________________2
STORAGE ______________________________________________________________________________________6
Improper maintenance can be hazardous.
Read and understand SECTION 1 - SAFETY PRECAUTIONS AND GUIDELINES before you perform any maintenance,
service or repairs.
SAFETY CHECKS - PRE-STARTING
Before starting each day, in addition to the 10 hour daily routine maintenance, check or inspect the following items to ensure
trouble free performance.
1. Check fluid lines, hoses, fittings, filler openings, drain plugs, pressure cap, muffler, safety shrouds and the area underneath
the unit for signs of leakage or damage. Fix any leaks and correct any damage before operating.
2. Inspect the entire unit for damaged or missing parts and repair or replace them as needed.
3. Check the fuel level. If necessary, fill the fuel tank with the proper fuel.
4. Check all fastening hardware to ensure it is adequately tightened and that none is missing or broken.
5. Do not operate faulty equipment.
6. Be observant of people and obstructions within the work area.
BEFORE OPERATING THE UNIT
1. Read the instruction manual and the engine manual.
2. Ensure that the 10 hour daily routine maintenance is performed.
4-1
Summary of Contents for RP300X
Page 1: ...OPERATION MAINTENANCE AND PARTS MANUAL For RP300 X REVERSIBLE PLATE COMPACTOR July 23 2009...
Page 26: ...SECTION 13 ROUTINE ADJUSTMENTS NOTE See Engine Manual for Engine Routine Adjustments 13 1...
Page 28: ...SECTION 15 SCHEMATICS NOTE No Schematics are necessary for this unit 15 1...
Page 29: ......
Page 30: ......