Fig. 43: O-ring (glass buffer)
2.
Carefully seat the O-ring (glass
buffer) onto the process connec-
tion (Fig. 43)so that it is properly
seated on the lower portion of
the process connection
(Fig. 44). When doing so, be
careful not to overstretch the O-
ring.
Fig. 44: Position of O-rings
3.
Repeat steps 1 and 2 for the
second process connection
Fig. 45: O-ring (centering the slot
nozzle)
4.
Place the O-ring (for centering
the slot nozzle) onto the slot
nozzle (Fig. 45/1) so that it sits
in the groove on the outlet side
of the slot nozzle.
Maintenance
Maintenance > Assembly
03.09.2018
DWG Module BASICS Flow Monitor
64