background image

 

 

                            MEI CASHFLOW SC / SC Advance  Page-11

Replacing the Programmed PROM

 (Continued)

:

8.  Close the acceptor module and reinstall it into the chassis.

9.  If  the power is on, the note acceptor will power up and then perform a run and stack.

UPDATING SOFTWARE

Summary of Contents for CASHFLOW SC

Page 1: ...MEI CASHFLOW SC SC Advance Operation Maintenance Manual...

Page 2: ...of CASHFLOW SC and SC Advance 5 Power Requirements 5 UPDATING SOFTWARE Using the CASHFLOW Portable Programing Module PPM 6 8 Replacing the PROM 9 11 MAINTENANCE Cleaning the Acceptor Module 12 Calibra...

Page 3: ...EASITRAX Soft Count Note 1 Retail models ending in 21 27 and 28 do not incorporate a barcode sensor G GDS N No Cashbox Note 2 EASITRAX model types will ultimately be available on most variants P PROM...

Page 4: ...IEW Serial Number 1 02Serial Number Codification Example Serial Number 27480369806 Description 27 Week Manufactured 0 52 4 Year manufactured Last Digit of Year 8 Manufacture Location 03 Configuration...

Page 5: ...identical CASHFLOW SC and SC Advance models Bill Entry Guides for CASHFLOW SC and SC Advance Not all bill entry guides fit in every machine Your choice regarding bill entry guides will depend on machi...

Page 6: ...G SOFTWARE There are two ways to perform software updates on the CASHFLOW SC or SC Advance note acceptor 1 By using the CASHFLOW Portable Programming Module PPM handheld device 2 By replacing the prog...

Page 7: ...LED and flashing red LED on the front of the PPM will indicate the device is busy 3 Both green and red LEDs on the PPM will light up solidly when the download has finished successfully The note accep...

Page 8: ...s allows you to manage handheld devices download files for devices change audit settings and upgrade PPM firmware Configuration allows you to load and save configurations to or from a file that can be...

Page 9: ...e by placing the palm of your hand on the front of the module and your fingers around the top of the yellow cover as shown in the dia gram to the right Pull the cover toward your hand and then lift up...

Page 10: ...PROM using a PLC puller 5 Insert the new PROM 6 To reinstall the yellow cover the acceptor module must remain open Position the back of the cover as shown below 7 Once the yellow cover is in the corre...

Page 11: ...dvance Page 11 Replacing the Programmed PROM Continued 8 Close the acceptor module and reinstall it into the chassis 9 If the power is on the note acceptor will power up and then perform a run and sta...

Page 12: ...2 Open the acceptor module by placing the palm of your hand on the front of the module and your fingers around the top of the yellow cover as shown in the diagram to the right Pull the cover toward y...

Page 13: ...g Cassette full Note LEDs not available on units that have straight feed bezels or shelf bezels The Out of Service line will toggle in concert with the flash codes EASITRAX Soft Count Diagnostic Codes...

Page 14: ...eptor Clear the jam from the note acceptor Green Left Off Yellow Center 3 Flashes Red Right Off Jam in the cashbox Remove the acceptor head and clear the jam from the cashbox Green Left Off Yellow Cen...

Reviews:

Related manuals for CASHFLOW SC