Connecting to the Transformer
AVTMTTR320-EN Rev A Oct 2008
17
3.
As shown in Figure 4-5, connect the heavy-duty clamps marked H1 and H2
of the test lead to the respective X1 and X2 terminals of the CT. Note that
the H and X leads are connected in reverse as compared to the Single and
Three phase Transformer testing described in the previous sections.
4.
As shown in Figure 4-5, connect the heavy-duty clamps marked X1 and X2
of the test lead to the respective H1 and H2 terminals of the CT. Ensure
correct polarity. Note that the H and X leads are connected in reverse as
compared to the Single and Three phase Transformer testing described in the
previous sections.
Figure 4-5. Setup for Testing Unmounted Current Transformer
Summary of Contents for TTR320 Series
Page 2: ......
Page 3: ...Three Phase TTR Transformer Turn Ratio Test Set TTR320 series...
Page 8: ...AVTMTTR320 EN Rev A Oct 2008 iv M...
Page 38: ...M AVTMTTR320 EN Rev A Oct 2008 30 M...
Page 44: ...M AVTMTTR320 EN Rev A Oct 2008 36 M...
Page 50: ...M AVTMTTR320 EN Rev A Oct 2008 42 M...
Page 66: ...M AVTMTTR300 Rev A Oct 2008 58...