6
-5 V / 5 V
7
-10 V / 10 V
11.4 Booting up secondary injection
To prepare the BALTO Modular for secondary injection, two methods can be used :
1. Remove all the current generators from the BALTO
2. Remove connectors 2 and 3 as depicted below
1
2
3
Cable 1 is required to provide the power to the Control Unit.
It is possible to use the Control Unit without a connection to the BALTO Modular. In that case a specific power cable
is required (available as an accessory). The cable is depicted below.
To prepare the BALTO Compact for secondary injection, remove the Power Unit (Current Generator) as depicted
below.
The start dialog will indicate that the Secondary Injection program is running.
www.megger.com
107
Secondary Injection.