background image

MPT12 Manual

24 May 2017

SECTION 4

Operation Instructions

4-6 (Blank)

Summary of Contents for MPT12

Page 1: ... CORP 700 Osuna Rd N E Albuquerque NM 87113 1 800 345 8889 505 345 2661 Fax 505 345 6190 www megacorpinc com MEGA Corp Inc All Rights Reserved GENUINE MEGA TECHNICAL MANUAL SPECIALTY HAULAGE SOLUTIONS FOR CONSTRUCTION AND MINING ...

Page 2: ...stem Description 2 1 Section 3 Commissioning 3 1 Section 4 Operation Instructions 4 1 Section 5 Maintenance and Repair 5 1 Section 6 Scheduled Maintenance Inspections 6 1 Section 7 Recommended Support Parts 7 1 Section 8 Illustrated Parts Breakdown 8 1 Section 9 Appendix Installation Drawings 9 A Page ...

Page 3: ...MPT12 Manual 24 May 2017 TABLE OF CONTENTS B Blank ...

Page 4: ...mponents and at moderate heights ensure proper safety procedures are maintained when performing these actions Failure to use and maintain proper safety equipment and procedures will cause injury death or damage to equipment WARNING CAUTION AND NOTES The following definitions are found throughout the manual and apply as follows Operating procedures and techniques which could result in personal inju...

Page 5: ... adhesive that secures the safety labels Loose adhesive will allow the safety labels to detach Replace any safety label that is damaged or missing If a safety label is attached to a part that is replaced install a new safety label on the replacement part TOXIC GAS HAZARD 1 Cutting or welding operation on the inside of the tank can cause the accumulation of toxic gases Read and understand instructi...

Page 6: ...followed CONFINED SPACE 6 Do not enter confined spaces without following established site specific procedures Failure to follow proper safety procedures will result in serious injury or death ABBREVIATIONS BFV Butterfly Valve CCW Counterclockwise CW Clockwise FIP Fault Isolation Procedures Ft lbs Foot Pounds of Torque GPM Gallons per Minute IPB Illustrated Parts Breakdown LT Left as viewed from th...

Page 7: ...tions 1 4 8 1 5 2 4 6 1 HYDRAULIC CYLINDERS 2 ENGINE HYDRAULIC PUMP 3 LEVER CONTROL SYSTEM 4 FILL PIPE 5 FILL PIPE VALVE 6 ACCESS LADDER 7 TOOL BOX 8 DISCHARGE TUBE 9 D O T LIGHTS 10 HYDRAULIC TANK REAR VIEW SIDE VIEW 1 1 3 7 5 4 6 9 9 9 10 MPT OVERVIEW TYPICAL ...

Page 8: ...ignage as specified by the customer For more information please contact the Mega Sales Department at 1 800 345 8889 or contact your local dealer MPT TANK The MPT tank is 2 59m 8 5 ft in diameter 11 13m 36 5 ft in length and has a capacity of 45 42 L 12 000 gallons The corners of the tank are reinforced to provide sturdy connection to supports An access ladder leading to the top of the tank is loca...

Page 9: ...CHARGE SYSTEM The MPT s water discharge system includes a 10 inch diameter discharge pipe with a flow rate of approximately 2 000 gal min a shut off valve with both a constant force wheel to ensure positive closure a weight and pulley system to secure the chain while positioning the tanker beneath the discharge pipe spout and a canvas discharge sock for the discharge pipe spout AXLE The heavy duty...

Page 10: ...nd charger analyzer Provides 12 volt power to the linear actuator as commanded by the remote FOB s 1 Remote Control Receiver 2 Solar Panel Charge Controller 3 20 Amp Actuator Fuse Remote FOB s Provided to command the operation of the butterfly valve through the remote control box Programming Remote FOB s The remote control FOB s can be programmed to operate in two different ways From Mega it is se...

Page 11: ...Push and Hold to operate Sealed Battery Black Box A 12 volt sealed battery located in a case and mounted in the gooseneck The battery is charged and conditioned by the chagrer analyzer unit Solar Panel Mounted on the front of the unit It provides charging of the sealed battery as controlled by the charger analyzer LIMITATIONS The remote control transmitter range is approximately 30 to 50 yards 27 ...

Page 12: ...E DISCHARGE PIPE IF EQUIPPED This option provides a means to discharge water to either side of the unit The pipe is mounted on a hinged flange to allow deployment and storage Simply unstow the pipe then swing out to allow bolting of the hinged flange and secure with the bolts Once deployed and bolted check the wire for security and adjust the turn buckle accordingly Once properly rigged and set th...

Page 13: ...MPT12 Manual 24 May 2017 SECTION 2 System Description 2 6 Blank ...

Page 14: ... or Direct 1 505 345 2661 or visit our website at www megacorpinc com for more contact information 1 Check hydraulic oil level 2 Check oil level in wheel hubs 3 Check engine oil fuel 4 Start engine 5 Remove locking pins 6 Raise tank until pin hoist clears top pinhole 7 Lower tank replace locking pins 8 Butterfly in closed position 9 Fill with water 10 Pull up on float adjust valve until water flow...

Page 15: ...MPT12 Manual 24 May 2017 SECTION 3 Commissioning 3 2 Blank ...

Page 16: ... utilizing the tank 4 Remove hitch pins and store in the tool box 5 Turn off the hydraulic power unit 6 Use the hydraulic control valves to lower the tank until it is resting on the ground Keep feet from under the frame or personal injury could occur Remove hoses or tools from under frame before lowering tank Extension of the front and rear hydraulic cylinders are controlled by separate valves To ...

Page 17: ... Remove all loose items from the unit Turn off the hydraulic power unit Secure the tool box SET UP 1 Read the engine operator s manual prior to operation 2 Select a level area with a stable foundation for positioning of the tower The area should be level in all directions and offer good access to water haulage equipment The tank should always be positioned on stable level ground before filling wit...

Page 18: ...in for the actuator to disengage it from the butterfly valve If multiple systems are in close proximity to one another less than 100 yards or 92 meters it may be possible to operate more then one unit simultaneously This may cause unexpected opening of the butterfly valve releasing water from the tower Ensure there is enough distance between the systems and all personnel are clear from underneath ...

Page 19: ...ior to lowering Never move a tank containing water 2 Shut off all water fill sources hydrant or pump to the fill pipes 3 Open discharge BFV and drain water from the tank Be careful not to drain the water so quickly that it will erode the ground beneath the frame 4 Use the hydraulic controls to lower the frame to the ground as described previously in Lowering procedures Keep feet from under the fra...

Page 20: ...MPT12 Manual 24 May 2017 SECTION 4 Operation Instructions 4 5 Figure 4 1 Tie downs ...

Page 21: ...MPT12 Manual 24 May 2017 SECTION 4 Operation Instructions 4 6 Blank ...

Page 22: ...r leaks 3 Inspect tank outer structure for damage 4 Interior coating equipped only Inspect tank interior coating for wear condition and deterioration Repair as required 5 Inspect all water ways pipes and couplings for security wear and leaks 6 Inspect all tank mounted wiring and hydraulic hoses for wear security and leaks REPAIR Paint Remove corrosion Prime and paint Interior Coating Epoxy or Uret...

Page 23: ...t 1 505 345 2661 or visit our website at www megacorpinc com for more detailed contact information FLOAT ADJUSTMENT SINGLE FILL PIPE 1 Open flow control valve all the way then close 2 Open flow control valve 3 to 3 1 2 turns 3 Start fill 4 Water should be coming out of float valve if not open flow control valve turn 5 Pull up on float 6 If water will not shut off close flow control valve of a turn...

Page 24: ... the hydraulic brake mounts onto the piloted axle brake flange LUBRICATION 1 Check oil level If below 0 25 add oil 2 Inspect for grease or oil contamination Change if required using the approved greases listed in Table 5 1 Do NOT use gasoline to clean parts Gasoline can explode or burn resulting in serious personal injury or death 3 Check for grease or oil on the brake disc drum or linings If nece...

Page 25: ... 2 modes of operation UP DOWN OPEN CLOSE 1 Push to start Push to stop or 2 Push and hold to operate release to stop Battery Group 27 AGM Absorbed Glass Mat spill proof no maintenance required 12VDC 100 Amp Hour rating Solar panel 65 Watt 3 71 Amps 12 VDC monocrystalline panel Solar panel charge controller 13 VDC cut in volt age 14 2 VDC cutout voltage 8 Amp maximum Electric actuator 12 VDC operati...

Page 26: ...nt Rockwell Specification NLGI Grade Grease Type Outside Temperature Automatic Slack Adjuster O 616 A 1 Clay Base Down to 40o C 40o F O 692 1 and 2 Lithium Base Down to 40o C 40o F O 645 2 Synthetic Oil Clay Base Down to 54oC 65oF Clevis Pins Any of Above See Above See Above See Above O 637 1 1 2 Calcium Base See grease manufacturer s specifications O 641 Anti Seize Table 5 4 Manual Slack Adjuster...

Page 27: ... SAE 75 40 35 40 2 O 76L Gear Oil MIL L 2105 D GL 5 SAE 75W 140 40 None 40 None O 76M Full Synthetic Oil MIL L 2105 D GL 5 SAE 75W 140 40 None 40 None O 76N Full Synthetic Oil MIL L 2105 D GL 5 SAE 75W 90 40 None 40 None Table 5 6 Trailer Axle Wheel Grease Specifications Grease Rockwell Specification NLGI Grade Grease Classification Outside Temperature Multi Purpose Grease O 617 A or O 617 B 1 2 L...

Page 28: ...d during wheel or hub removal or if the oil is contaminated X Heavy Duty Service If the MPT accumulates over 60 000 miles a year change the oil and grease the bearings every 30 000 miles X Heavy Duty Service If the MPT accumulates less than 60 000 miles a year change the oil and grease the bearings every six months X Standard Duty Service If the MPT accumulates over 100 000 miles a year change the...

Page 29: ...ONTROL SYSTEM 150 HRS WEEKLY 250 HRS BI WEEKLY 500 HRS MONTHLY 1 000 HRS QUARTERLY 5 000 HRS ANNUALLY 1 Check engine hydraulic tank hoses and cylinders for damage leaks and security Repair as required X 2 Inspect discharge and inlet valves for damage leaks and security Repair as required X ...

Page 30: ...ischarge Sock w Metal Grommet 302253 1 3 Discharge Sock Drawstring Style 304856 1 4 Worm Drive Clamp 304855 1 5 Float Assembly See Illustrated Parts Breakdown 6 Hairpin 354671 7 Valve Float 1 303202 1 8 Valve In Line 3 302457 1 C BRAKES GROUP PART DESCRIPTION PART NO QTY 1 Couplers Gladhand Blue Emergency Brake Driver s Side 301300 2 Couplers Gladhand Red Service Brake Passenger Side 301301 3 Petc...

Page 31: ...at www megacorpinc com for more detailed contact information E MISCELLANEOUS PARTS GROUP PART DESCRIPTION LOCATION USE PART NO QTY 1 Chain Front of trailer 353540 1 2 Weight Counter Balance End of rope on MPT 10 or MPT 12 034810 1 3 Rope Assembly Front of trailer 032826 1 4 Pulley Swivel Passenger side of trailer rope attaches to pully to smooth the travel of rope 354276 1 5 Hitch Pin Assembly Kee...

Page 32: ... Valve Group 8 3 Hydraulic Control Valve Assembly 8 4 Lights 8 5 NO PART NO DESCRIPTION QTY 1 354259 BALL FLOAT 1 2 303202 FLOAT VALVE 1 BRASS 1 3 354422 3 8 ALL THREAD X 7 00 1 4 352706 BELL REDUCER 1 2 FPT TO 1 FPT 1 5 354337 HAIRPIN COTTER 3 16 1 6 354258 CLAMPING STUD 1 7 351088 AIR FTG 1469x8 1 8 351082 AIR FTG 1469x6 1 9 352892 AERO FTG 2089 6 4S 1 10 300283 CONTROL VALVE 1 4 NPT 1 11 351124...

Page 33: ...CLAMPING STUD 1 7 351088 AIR FTG 1469x8 1 8 351082 AIR FTG 1469x6 2 9 352892 AERO FTG 2089 6 4S 2 10 300283 CONTROL VALVE 1 4 NPT 2 11 351124 AIR FTG 1480x6 2 12 352467 AERO FTG 2083 4 4S 2 13 301299 BALL VALVE 1 2 FPT 2 14 352472 AERO 2083 8 8S 1 15 354037 AERO 2085 8 8S 2 16 352858 AERO 2090 8 8S 1 17 351072 AIR FTG 1468x8x8 2 18 350851 PIPE PLUG 3 8 2 19 351142 TUBING ø1 2 x 24 1 20 351142 TUBI...

Page 34: ... VALVE 10 1 3 304855 WORM DRIVE CLAMP 1 4 304856 DISCHARGE SOCK ø11 5 1 5 350003 WASHER FLAT 3 8 1 6 350006 WASHER FLAT 5 8 12 7 350025 NUT HEX 3 8 16 UNC 1 8 350029 NUT HEX 5 8 11 UNC 6 9 350146 SCREW CAP 3 8 16 UNC X1 25 1 10 350148 SCREW CAP 3 8 16 UNC X1 75 1 11 350295 SCREW CAP 5 8 11 UNC X5 00 6 12 353540 UTILITY CHAIN 3 16 X 23 0 1 13 354272 COLD SHUT 1 4 2 ...

Page 35: ...02244 VALVE HYDRAULIC CONTROL 1 2 302316 FILTER 1 3 352310 AERO 2021 8 8S 1 4 353225 AERO 2216 8 10S 1 5 352452 AERO 2024 12 12S 1 6 352871 AERO 2081 8 4S 1 7 354588 AERO FD90 1045 4 4S 1 8 354070 AERO 2085 12 8S 1 9 354340 AERO 2216 8 8S 1 10 354704 TEE AERO 2092 8 8S 1 11 352612 AERO 202702 8 10S 3 12 352616 AERO 202702 10 8S 1 ...

Page 36: ...kdown 8 5 LIGHTS NO PART NO DESCRIPTION QTY 1 355374 CLEARANCE LIGHT RED 2 2 355375 CLEARANCE LIGHT AMBER 4 3 302607 STOP TAIL LIGHT 4 4 300241 LIGHT BAR 1 5 354647 SCREW PAN 10 24 UNC X 0 75 4 6 354648 NUT LOCK 10 24 4 7 350000 WASHER FLAT 10 4 3 1 4 5 6 7 2 ...

Page 37: ...MPT12 Manual 24 May 2017 SECTION 8 Illustrated Parts Breakdown 8 6 Blank ...

Page 38: ...ed to be used in conjunction with previous section information to successfully produce a fully operational MPT12 system If your system is not covered in this manual you are having difficulties with the installation or need additional information or assistance please contact The MEGA Corp Product Support Group at U S Toll Free 1 800 345 8889 Direct 1 505 345 2661 or visit our website at www megacor...

Page 39: ...MPT12 Manual 24 May 2017 SECTION 9 Appendix Installation Drawings 9 B Blank ...

Page 40: ...Y THIS COMPANY IT SHALL NOT BE USED FOR ANY OTHER PURPOSE WITHOUT THE PRIOR CONSENT OF MEGA CORPORATION TOLERANCE UNLESS OTHERWISE SPECIFIED 3 PLACES 0 010 2 PLACES 0 030 ANGULAR 1 DWG TITLE MPT12 SHIPPING DRAWING SCALE NTS DATE Jan 17 17 DWG NO 037379 DRAWN BY DSD SHEET 1 OF 1 REVISIONS REV DESCRIPTION DATE ECR A ADDED SHIPPING WEIGHT APR 19 14 CJD B NEW DIMS FROM 3D CAD MODEL Jan 17 17 DSD SHIPP...

Page 41: ...ION AND IS USED ONLY IN REFERENCE TO WORK PROPOSED OR CONTRACTED BY THIS COMPANY IT SHALL NOT BE USED FOR ANY OTHER PURPOSE WITHOUT THE PRIOR CONSENT OF MEGA CORPORATION TOLERANCE UNLESS OTHERWISE SPECIFIED 3 PLACES 0 010 2 PLACES 0 030 ANGULAR 1 DWG TITLE SALES DRAWING RAISED 12 000 GALLONS SCALE NTS DATE Jan 18 17 DWG NO 051346 DRAWN BY DSD SHEET 1 OF 2 TANK SHOWN IN RAISED POSITION Appendix A M...

Page 42: ... BY THIS COMPANY IT SHALL NOT BE USED FOR ANY OTHER PURPOSE WITHOUT THE PRIOR CONSENT OF MEGA CORPORATION TOLERANCE UNLESS OTHERWISE SPECIFIED 3 PLACES 0 010 2 PLACES 0 030 ANGULAR 1 DWG TITLE SALES DRAWING RAISED 12 000 GALLONS SCALE NTS DATE Jan 18 17 DWG NO 051346 DRAWN BY DSD SHEET 2 OF 2 SIDE DISCHARGE OPTION SHOWN ALL DIMENSIONS SAME AS STANDARD TANK EXCEPT WHERE INDICATED Appendix A MPT12 A...

Page 43: ...SHEET OF DRAWN BY 2 PLACES 0 03 TOLERANCE UNLESS OTHERWISE SPECIFIED 3 PLACES 0 010 DRAWING TITLE SCALE DATE ANGULAR 1 NONE HYDRAULIC CONTROL VALVE ENGINE BOX TOOL Appendix A MPT12 A 4 ...

Page 44: ...Appendix A MPT12 A 5 ...

Page 45: ...9 BALL VALVE 1 2 FPT 1 STK 14 352472 AERO 2083 8 8S 1 STK 15 354037 AERO 2085 8 8S 1 STK 16 352858 AERO 2090 8 8S 1 STK 17 351072 AIR FTG 1468X8X8 1 STK 18 350852 PLUG PIPE 1 2 SQ HEAD 1 STK 19 351142 TUBING Ø1 2 X 126 1 STK 20 351141 TUBING Ø3 8 X 12 2 STK SHEET OF DRAWN BY 2 PLACES 0 03 TOLERANCE UNLESS OTHERWISE SPECIFIED 3 PLACES 0 010 DRAWING TITLE SCALE DATE ANGULAR 1 NONE 046981 1 1 CJD Feb...

Page 46: ...Appendix A MPT12 A 7 ...

Page 47: ... IF EQUIPPED Appendix A MPT12 A 8 ...

Page 48: ...Appendix A MPT12 A 9 ...

Page 49: ...Appendix A MPT12 A 10 ...

Page 50: ...NY IT SHALL NOT BE USED FOR ANY OTHER PURPOSE WITHOUT THE PRIOR CONSENT OF MEGA CORPORATION TOLERANCE UNLESS OTHERWISE SPECIFIED 3 PLACES 0 010 2 PLACES 0 030 ANGULAR 1 DWG TITLE MPT12 10IN VICTAULIC CLEANOUT SCALE NTS DATE Feb 07 17 DWG NO 051530 DRAWN BY DSD SHEET 1 OF 1 REVISIONS REV DESCRIPTION DATE ECR A MOVED TO CLEAR BOTH PIPES Apr 24 17 17033 WELDING MODIFICATIONS FOR THIS OPTION ASSEMBLY ...

Page 51: ...PLATE A36 25 1 REF 4 039874 PLATE A36 25 1 REF 5 047166 MPT12 20 BFV AND HANDLE INSTALL 1 REF 6 350005 WASHER FLAT 1 2 4 SPLY 7 350239 SCREW CAP 1 2 13 UNC X3 50 2 SPLY 8 352677 NUT LOCK 1 2 13 2 352583 SPLY 9 354591 SPRING 13 16 ID X 2 50 2 300180 STK REVISIONS REV DESCRIPTION DATE ECR A 031877 037227 039873 039874 TO REF Jan 13 14 14005 NOTE 1 PRE ASSEMBLE ITEMS 039873 039874 WITH SPRING COMPRES...

Page 52: ...Y VALVE 10 1 STK 3 304855 CLAMP WORM DRIVE 1 SPLY 4 304856 DISCHARGE SOCK 48 X 11 5 1 STK 5 350006 WASHER FLAT 5 8 12 SPLY 6 350029 NUT HEX 5 8 11 UNC 6 SPLY 7 350231 SCREW CAP 1 2 13 UNC X1 50 2 SPLY 8 350294 SCREW CAP 5 8 11 UNC X4 50 6 350277 SPLY 9 353540 UTILITY CHAIN 3 16 X 23 0 1 STK 10 353540 UTILITY CHAIN 3 16 X 23 0 1 STK 11 354272 COLD SHUT 1 4 2 STK REVISIONS REV DESCRIPTION DATE ECR A...

Page 53: ... 350023 NUT HEX 1 4 20 UNC 4 SPLY 19 350061 SCREW CAP 1 4 20 UNC X1 00 4 350057 SPLY 20 354657 PIN SAFETY SNAP 1 STK 21 355022 LOCKRING NUT 1 2 1 STK 22 355455 WASHER FLAT FENDER 3 8 1 SPLY 700 Osuna Rd N E P O Box 26146 Albuquerque NM 87125 505 345 2661 THIS DRAWING IS THE PROPERTY OF MEGA CORPORATION AND IS USED ONLY IN REFERENCE TO WORK PROPOSED OR CONTRACTED BY THIS COMPANY IT SHALL NOT BE USE...

Page 54: ...PURPOSE WITHOUT THE PRIOR CONSENT OF MEGA CORPORATION TOLERANCE UNLESS OTHERWISE SPECIFIED 3 PLACES 0 010 2 PLACES 0 030 ANGULAR 1 DWG TITLE MPT12 REMOTE ACTUATION MECHANICAL ASSEMBLY SCALE NTS DATE May 15 17 DWG NO 051833 DRAWN BY DSD SHEET 2 OF 2 LEAVE 6 LOOP BEFORE CLAMPING LEAVE 2 OF TUBING BEYOND P CLAMP WIRE ROPE 3 16 x12 051833 01 TUBING NYLON AIR 3 8 X 96 051833 02 1 1 7 1 8 1 14 1 20 1 6 ...

Page 55: ... MEGA CORPORATION AND IS USED ONLY IN REFERENCE TO WORK PROPOSED OR CONTRACTED BY THIS COMPANY IT SHALL NOT BE USED FOR ANY OTHER PURPOSE WITHOUT THE PRIOR CONSENT OF MEGA CORPORATION TOLERANCE UNLESS OTHERWISE SPECIFIED 3 PLACES 0 010 2 PLACES 0 030 ANGULAR 1 DWG TITLE REMOTE ACTUATION WELDON SCALE NTS DATE Apr 10 17 DWG NO 051724 DRAWN BY DSD SHEET 1 OF 2 REVISIONS REV DESCRIPTION DATE ECR A ADD...

Page 56: ... WORK PROPOSED OR CONTRACTED BY THIS COMPANY IT SHALL NOT BE USED FOR ANY OTHER PURPOSE WITHOUT THE PRIOR CONSENT OF MEGA CORPORATION TOLERANCE UNLESS OTHERWISE SPECIFIED 3 PLACES 0 010 2 PLACES 0 030 ANGULAR 1 DWG TITLE REMOTE ACTUATOR WELDON SCALE NTS DATE May 11 17 DWG NO 051724 DRAWN BY DSD SHEET 2 OF 2 SECTION J J SECTION K K WP1 19 19 1 3 4 1 1 1 Appendix A MPT12 A 17 ...

Page 57: ...E PROPERTY OF MEGA CORPORATION AND IS USED ONLY IN REFERENCE TO WORK PROPOSED OR CONTRACTED BY THIS COMPANY IT SHALL NOT BE USED FOR ANY OTHER PURPOSE WITHOUT THE PRIOR CONSENT OF MEGA CORPORATION TOLERANCE UNLESS OTHERWISE SPECIFIED 3 PLACES 0 010 2 PLACES 0 030 ANGULAR 1 DWG TITLE ACTUATOR BRACKET WELDON SCALE NTS DATE Apr 10 17 DWG NO 051725 DRAWN BY DSD SHEET 1 OF 1 REVISIONS REV DESCRIPTION D...

Page 58: ... MATERIAL 051835 ENCLOSURE ASSEMBLY 1 REF 10 9 8 7 6 ENCLOSURE 306373 2 SPLY BUTT SPLICE 1 RED BLACK RED BLACK BATTERY BATTERY SOLAR PANEL SOLAR PANEL YELLOW GREEN RED BLACK BATTERY BATTERY MOTOR MOTOR YELLOW GREEN BROWN WHITE RED BLACK A A SECTION A A 2 BLUE BROWN 1 B B SECTION B B 2 GREEN YELLOW 1 D D SECTION D D 2 BLACK RED 1 C C SECTION C C 2 BLACK RED 1 BROWN WHITE DEUTSCH RECEPTACLE 2 CON DE...

Page 59: ...G 1 STK 9 355022 LOCKRING NUT 1 2 1 STK 700 Osuna Rd N E P O Box 26146 Albuquerque NM 87125 505 345 2661 THIS DRAWING IS THE PROPERTY OF MEGA CORPORATION AND IS USED ONLY IN REFERENCE TO WORK PROPOSED OR CONTRACTED BY THIS COMPANY IT SHALL NOT BE USED FOR ANY OTHER PURPOSE WITHOUT THE PRIOR CONSENT OF MEGA CORPORATION TOLERANCE UNLESS OTHERWISE SPECIFIED 3 PLACES 0 010 2 PLACES 0 030 ANGULAR 1 DWG...

Page 60: ...16 ID X 2 50 2 300180 STK 700 Osuna Rd N E P O Box 26146 Albuquerque NM 87125 505 345 2661 THIS DRAWING IS THE PROPERTY OF MEGA CORPORATION AND IS USED ONLY IN REFERENCE TO WORK PROPOSED OR CONTRACTED BY THIS COMPANY IT SHALL NOT BE USED FOR ANY OTHER PURPOSE WITHOUT THE PRIOR CONSENT OF MEGA CORPORATION TOLERANCE UNLESS OTHERWISE SPECIFIED 3 PLACES 0 010 2 PLACES 0 030 ANGULAR 1 DWG TITLE SIDE DI...

Page 61: ... 307073 GROMMET 75ID 1 63 OD GROOVE 38 X 1 13Ø 1 STK 11 045811 01 CABLE 6 CON 14 AWG X 45 1 300488 SPLY 12 305161 DEUTSCH PLUG 6 CON 1 STK 13 305163 LOCK 6 SOCKET 1 SPLY 14 303380 DEUTSCH PIN 16 20 AWG 6 SPLY SHEET OF DRAWN BY 2 PLACES 0 03 TOLERANCE UNLESS OTHERWISE SPECIFIED 3 PLACES 0 010 DRAWING TITLE SCALE DATE ANGULAR 1 NONE 045811 M REV DESCRIPTION DATE ECR A ADDED 306373 306960 354677 3550...

Page 62: ...NCE UNLESS OTHERWISE SPECIFIED 3 PLACES 0 010 DRAWING TITLE SCALE DATE ANGULAR 1 NONE 045811 2 BROWN GREEN RED YELLOW BLACK BLACK 2 STR WHITE 2 STR WHITE RUBBER BOOT ON BOTTOM OF CONNECTOR FRONT MTG PLATE FROM TRUCK SUPPLY WIRING DIAGRAM RED BLACK RED JUNCTION BOX LEFT MIDDLE CLEARANCE LEFT FRONT CLEARANCE BLACK RIGHT MIDDLE CLEARANCE RIGHT FRONT CLEARANCE ITEMS IN THIS PORTION ARE IN 046839 Appen...

Page 63: ...TK STK DETAIL 2 6X SCALE 6X SCALE VIEW BB B B 2 2 3 6 PIPE COLUMN 4X SCALE DETAIL 1 A A SECTION AA 8X SCALE 6 5 4 1 4 CHAIN FOR OPERATING THE BUTTERFLY VALVE 7 ROUND BOSS SEE DWG 046842 FOR INSTALLATION DETAIL 1 TOOL BOX 6 1 2 HP ENGINE HYDRAULIC CONTROL VALVE DETAIL 2 FRONT VIEW SIDE VIEW REAR VIEW 5 06 1 50 ASSEMBLY INSTRUCTIONS ATTACH CHAIN FROM ITEM 354257 TO S HOOK WELD S HOOK TO 6 PIPE APPRO...

Page 64: ...180 88 303756 303757 303753 303755 303754 1 2 1 1 1 STK STK STK STK STK 1 2 3 4 5 352612 AERO 202702 8 8S 4 352296 STK 7 7 7 7 036881 032035 SEE DWG HYDRAULIC SYSTEM SCHEMATIC 034813 1 2 I D HOSE ASSY X 118 92 303796 6 1 STK 034813 1 1 RON R Jul 12 01 HYDRAULIC SYSTEM STAND TANK MPT10 MPT12 ME SHEET OF DRAWN BY 2 PLACES 0 03 TOLERANCE UNLESS OTHERWISE SPECIFIED 3 PLACES 0 010 DRAWING TITLE SCALE D...

Page 65: ...ITLE SCALE DATE ANGULAR 1 NONE REVISIONS REV DESCRIPTION DATE ECR A ADDED SUPPLY AND RETURN PIPING DETAILS B CHANGED SCHEMATIC RENUMBERED BOM DELETED 302534 350851 351086 351082 300295 352474 C ADDED 036655 D ADDED 351086 CHANGED QTY OF ITEM 1 REPLACED 351088 WITH 351087 E CONVERTED PNEUMATIC PIPING TO ASSEMBLIES ON BOLT ON DRW F SEE ECR ST 150 G CHANGED SCHEMATIC BOM DELETED 351072 351066 352871 ...

Page 66: ...Appendix A MPT12 A 27 ...

Page 67: ... ANGULAR 1 DWG TITLE INSTRUCTION ID TAG STAMPING SCALE NTS DATE Nov 20 17 DWG NO 048512 DRAWN BY TCS SHEET 1 OF 1 SERIAL NUMBER WWWWW WWWWW IS WORKORDER NUMBER FOR SPECIFIC JOB MODEL NUMBER MPT IS VOLUME OF TANK AS SPECIFIED ON THE SALES ORDER DIVIDED BY 1 000 ROUND DOWN TO NEAREST THOUSAND PART NO MEGA STAND TANK DATA GAL IS VOLUME OF THE TANK AS SPECIFIED ON THE SALES ORDER IN GALLONS ROUNDED DO...

Page 68: ...Y 2 PLACES 0 03 TOLERANCE UNLESS OTHERWISE SPECIFIED 3 PLACES 0 010 DRAWING TITLE SCALE DATE ANGULAR 1 NONE 4 5 2 1 3 17 6 13 12 1 NOTE FOR TWO FILL PIPE APPLICATION ONLY SHIPPING DATA HEIGHT 13 9 IN LOWERED POSITION LENGTH 40 6 WIDTH 8 6 WEIGHT 21 400 LBS D CHANGE CYLINDER LABELS TO MATCH CONTROLS Feb 18 15 CSB 12 13 E DELETED 354764 355162 355165 355168 355169 355177 Mar 23 16 16028 ADDED 307408...

Reviews: