Cleaning and maintenance
Installation Maintenance:
The operator has to make sure that the unit is operating safely and has the installations and electron-
ics checked by an expert every 2 years.
The following points have to be considered during the inspection:
1) All screws used for installing the device or part of the device have to be tightly connected and must not be corroded.
2) There must not be any deformations on the housing, fixation and installation spots (ceiling, suspension, trussing).
3) The electronic power supply cables must not show any damages, material fatigue (e.g. porous cables) or sediments. Further
instructions depending on the installation spot and usage have to be adhered by a skilled installer and any safety problems
have to be removed.
Note:
There is no serviceable parts inside the device except for the LED’s. Maintenance and service operations are to be carried
out by authorized dealers.
Replacing the fuse:
Only replace the fuse with the same type and rating. Fuse is located inside the power supply
Replacing the power cable:
If the power cable of this device becomes damaged, it has to be replaced by authorized dealers or
trained professional only.
Should you have further questions , please contact your dealer.
9
Parts List
7100-my
Mounting Yolke
7100-Knob
Black Knob
7100-knobW
White Knob
7100-ps
Power supply
7100-bd
Barn door attachment
7100-dmx5
DMX 5pin connector card
7100-dmx3
DMX 3pin connector card
Rigging the fixture
Caution!
1. The installations must be carried out by an authorized dealer or trained professional.
2. Unit may cause severe injures if you have doubts concerning the safety do not install.
3. Unit is to be 24inches away from flammable materials (decoration material)
4. Use high quality installation equipment to hang unit.
When rigging a unit it is very important that you follow common safety procedures. Rigging requires extensive experience includ-
ing but not limited to calculating working loads, material being used and periodic safety inspections. If you lack these qualifica-
tions, do not attempt the installation yourself, instead use a professional structural rigger.
When rigging the unit always be secured with a secondary safety attachment. The installation location of the UniColor CM5 has
got to be built in the way that it can hold 10 times the weight for 1 hour with out any harming. Installation should be checked at
least one time a year by a skilled person.
7110-mpcbSC
Main PCB
7110-dis-SC
Display 3Ch Control
Summary of Contents for UniColor
Page 2: ......